Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Roadworks Contributions
15.   Accontribution of $5,960 shall be paid to the Council towards the cost of improvements
      to the major road network of Cooroy, as a result of increase traffic generation caused
      by the proposed development. The contribution shall be paid to the Council prior to
      obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from December 2007 until
      the date of payment.
16.   A contribution of $160,975 shall be paid to the Council towards the cost of
      improvements to Cooroy Mountain Road, as a result of increase traffic generation
      caused by the proposed development. The contribution shall be paid to the Council
      prior to obtaining a Development Permit for Operational Works. This amount will be
      subject to variations in the Consumer Price Index, All Groups Brisbane from December
      2007 until the date of payment.
Water Quality
17.   The applicant shall submit a Water Quality Management Plan for approval prior to the
      issue of any Operational Works Permit.    The water quality management plan shall
      address treatment of runoff from the proposed use including effluent, car park runoff
      and by product of the industrial use occurring on site. It shall demonstrate that the
      treatment system proposed results in a no worsening of the water quality of runoff from
      the site as a result of the business operations. It will include the requirement for water
      quality to be monitored for a period of three years from the construction of the car
      parking and effluent disposal systems.
Effluent Disposal
18.   -
18A. The design and construction of the on-site effluent disposal system and disposal area
      shall be in accordance with the  Site and Soil Investigation for On-site Wastewater
     Treatment and Effluent Disposal prepared by Future-plus Environmental, dated
      February 2014, subject to the following requirements:
      (i) | Ongoing monitoring of treatment process and disposal areas shall be undertaken
           to ensure both are functioning effectively over time. They shall be undertaken
           generally as follows:
           °     Annual monitoring shall be undertaken from the time of commissioning to
                 determine the quality of the wastewater produced from the effluent
                 treatment system;
           °     Monitoring of the soils, vegetation and groundwater in the application area
                 shall be undertaken every three years to establish that such is not
                 percolating into the groundwater;
           °     Sampling and testing shall be in accordance with relevant regulatory
                 requirements and manuals such as those provided by the Environmental
                 Protection Agency, with testing undertaken by an accredited Laboratory;
           °     Continuous monitoring shall be undertaken by the system for any water on
                 the surface of the application area, downslope resurfacing, changing plant
                 growth on or around the application area and any other signs of problems,
                 and addressed through maintenance or servicing.
     (ii)  =
     (iii) -
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.