Roadworks Contributions
15. Accontribution of $5,960 shall be paid to the Council towards the cost of improvements
to the major road network of Cooroy, as a result of increase traffic generation caused
by the proposed development. The contribution shall be paid to the Council prior to
obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Consumer Price Index, All Groups Brisbane from December 2007 until
the date of payment.
16. A contribution of $160,975 shall be paid to the Council towards the cost of
improvements to Cooroy Mountain Road, as a result of increase traffic generation
caused by the proposed development. The contribution shall be paid to the Council
prior to obtaining a Development Permit for Operational Works. This amount will be
subject to variations in the Consumer Price Index, All Groups Brisbane from December
2007 until the date of payment.
Water Quality
17. The applicant shall submit a Water Quality Management Plan for approval prior to the
issue of any Operational Works Permit. The water quality management plan shall
address treatment of runoff from the proposed use including effluent, car park runoff
and by product of the industrial use occurring on site. It shall demonstrate that the
treatment system proposed results in a no worsening of the water quality of runoff from
the site as a result of the business operations. It will include the requirement for water
quality to be monitored for a period of three years from the construction of the car
parking and effluent disposal systems.
Effluent Disposal
18. -
18A. The design and construction of the on-site effluent disposal system and disposal area
shall be in accordance with the Site and Soil Investigation for On-site Wastewater
Treatment and Effluent Disposal prepared by Future-plus Environmental, dated
February 2014, subject to the following requirements:
(i) | Ongoing monitoring of treatment process and disposal areas shall be undertaken
to ensure both are functioning effectively over time. They shall be undertaken
generally as follows:
° Annual monitoring shall be undertaken from the time of commissioning to
determine the quality of the wastewater produced from the effluent
treatment system;
° Monitoring of the soils, vegetation and groundwater in the application area
shall be undertaken every three years to establish that such is not
percolating into the groundwater;
° Sampling and testing shall be in accordance with relevant regulatory
requirements and manuals such as those provided by the Environmental
Protection Agency, with testing undertaken by an accredited Laboratory;
° Continuous monitoring shall be undertaken by the system for any water on
the surface of the application area, downslope resurfacing, changing plant
growth on or around the application area and any other signs of problems,
and addressed through maintenance or servicing.
(ii) =
(iii) -See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.