(iv) -
      (vy) -
      (vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site
           washing of any plant or equipment is necessary, all wastewater shall be
           collected in a sump and disposed of off-site as trade waste by a registered
           operator.
      (vii) -
      (viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan
           (Open Space-Conservation & Waterway Protection) is to be undertaken in
           addition to replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site-
           Based Stormwater Management Plan.
18B. -
Erosion & Sediment Control
19.   Any person acting on this permit shall prevent erosion and sediment export from
      leaving the site. Site control measures such as silt fencing, controlled gravel access to
      the site and controlled disposal of waste, will be necessary.  In this regard plans
      detailing the methods of controlling erosion and sediment are required to be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational
      Works.
General
20.   For the following classes of work associated with development, a Development Permit
      for Operational Works must be obtained prior to commencement of works relating to
      that class of work. The application may combine any or all of these classes of work:-
      °    Access and/or Carparking.
      °    Roadworks.
      °    Stormwater Drainage.
      °    Frontage Works.
      °    Erosion & Sediment Control
21.   A suitably qualified Registered Professional Engineer shall prepare engineering
      drawings and specifications for all engineering works that will become Council
      infrastructure, which shall be submitted in conjunction with an application for a
      Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94
      zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
      application for Operational Works.
22.   Digital detailed designs including drawings, calculations, specifications and a schedule
      of works, shall be submitted with any application for a Development Permit for
      Operational Works in respect of roadworks and stormwater drainage works. The
      design shall be in accordance with Council’s Planning Scheme Policy PSPO5 —
      Engineering Design Standards — Roads, Drainage and Earthworks. To avoid conflict
      with underground pipes or services, all existing and proposed services required by the
      development shall be shown on the plans.
23.   To facilitate production of As Constructed drawings it is suggested that all design
      drawings are submitted in the Asset Design and As Constructed (ADAC) digital format.
      (Guidelines on the use of ADAC are available at www.adac.com.au).
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.