Lake MacDonald Drive Cooroy - WMP
Workplace Management Plan
Lake MacDonald Drive, Cooroy
Medical treatment required (MTI), Medium Medium High High Extreme
damage / theft less than $100,000 but Moderate
more than $10,000 6 9 13 17 20
First aid treatment required (FAI), Low Low Medium High High
damage / theft less than $10,000 but Minor
more than $1,000 3 5 8 12 16
A near miss, no injuries, damage / Low Low Low Medium High
Insignificant
theft less than $1000 1 2 4 7 16
Once a risk rating has been identified, actions can be taken to determine whether the activity can commence.
The below action requirements must be carried out for the applicable risk ratings;
Note: Always conduct a risk assessment before and after the control measures are implemented as this will
identify if the control measures are effective in reducing risks.
Rating Procedure Following Risk Assessment Control Application
Any hazard assessed presenting extreme risk level will
Activity must not commence. Must eliminate
Extreme only be allowed to be controlled using elimination and
hazard or introduce further controls to further
18 - 25 or engineering controls as the primary source of
reduce the risk.
controls.
Activity must not commence without Compliance
Any hazard assessed as presenting high or medium
Advisor or higher approval and appropriate
High risk level will only be allowed to be controlled using a
supervision by Project Manager or Foreman.
10 - 17 combination of at least one engineering control and one
Implement strict control measures to further
lower level controls as appropriate.
reduce risk.
Project Manager and Foreman must determine Any hazard assessed as presenting high or medium
Medium appropriate level of supervision required. risk level will only be allowed to be controlled using a
6-9 Implement strict control measures to further combination of at least one engineering control and one
reduce risk. lower level controls as appropriate.
Any hazard assessed as presenting a low risk level will
be permitted to be controlled using a combination of
Low Monitor, manage and carry out activity in
controls as appropriate, more than one lower level
1-5 accordance with identified controls.
control must be applied if elimination and or
engineering controls are not practicable.
Where a hazard has been identified, control measures must be implemented to eliminate or minimise the level
of risk. When deciding on the control measures to eliminate or minimise risk, the hierarchy of control must be
considered. The Hierarchy of Control is a list of control measures, in priority order, that can be used to eliminate
or minimise exposure to the hazard
IMS-04-01_P – Reviewed – September 2020 Document Uncontrolled When Printed Page 21 of 60