Lake MacDonald Drive Cooroy - WMP
Workplace Management Plan
Lake MacDonald Drive, Cooroy
▪ Confined space
▪ Excavation
▪ Traffic
▪ Mobile plant
▪ Working in or adjacent to water
▪ Hazardous chemicals
▪ Electrical Safety General
In addition, Shadforth have identified HRA’s associated with the works on this project;
▪ Manual handling
▪ Slips Trips and Falls
▪ Using quick cut saws
▪ Hot works
▪ Refuelling of small plant and equipment
This plan outlines the procedures and/or controls and permits to be followed, where the following activities
have been identified:
Demolition
Demolition works on Shadforth Sites is outsourced to specialist contractors, minimum controls to be
implemented are outlined in:
▪ Civil Construction SWMS IMS-10-25 – Demolition Section
Hot Works
All Hot Works must be carried out in accordance with:
▪ Hot Works Procedure IMS-02-28
▪ Civil Construction SWMS IMS-10-25 – Hot Works Section
▪ Hot Works Permit IMS-05-18.
Confined Spaces
All Confined Space work must be carried out in accordance with;
▪ Confined Space Procedure IMS-02-02
▪ Civil Construction SWMS IMS-10-25 – Confined Space Section
▪ Confined Space Permit IMS-05-05.
Hazardous Chemicals
All works with Hazardous Substances must be carried out in accordance with;
▪ Hazardous Chemicals Procedure IMS-02-08
▪ Civil Construction SWMS IMS-10-25 – Hazardous Chemical Section
Excavation
When Working in or around excavations, all works must be carried out in accordance with:
▪ Excavation Procedure IMS-02-05
IMS-04-01_P – Reviewed – September 2020 Document Uncontrolled When Printed Page 24 of 60