Lake MacDonald Drive Cooroy - WMP
Workplace Management Plan
Lake MacDonald Drive, Cooroy
▪ Civil Construction SWMS IMS-10-25 – Excavation and Trenching, Installation of Trench Shields/plates,
working near underground services Sections
▪ Excavation Permit IMS-05-17
Manual Handling
All Manual Handling works must be carried out in accordance with:
▪ Civil Construction SWMS IMS-10-25 – Manual Handling Section
Slips, Trips & Falls
When operating, all works must be carried out in accordance with:
▪ Civil Construction SWMS IMS-10-25
▪ Slips, Trips & Falls Training Paper IMS-11-26
Mobile Plant
When operating or working near Mobile Plant, all works must be carried out in accordance with:
▪ Mobile Plant Procedure IMS-02-32
▪ Verification of Competency Procedure IMS-02-20
▪ Civil Construction SWMS IMS-10-25 – Mobile Plant Section
▪ Plant Hazard Assessment IMS-05-27 - A plant risk assessment (PHA’s) will be carried out on all items of
plant and safe operating instructions including maintenance service and inspection details will form part of
this assessment. Operators must acknowledge and sign onto the PHA Form IMS-05-27 before operation of
the plant.
Lifting and Cranes
When working with cranes or conducting lifting (this includes the use of an excavator in crane mode), all works
must be carried out in accordance with:
▪ Crane Operations Procedure IMS-02-33
▪ Civil Construction SWMS IMS-10-25 – Lifting Section
▪ Lifting Task Assessment IMS-05-83
▪ Critical lifts require detailed specific lift plans in line the relevant procedure
Working at Heights
Where it is possible to fall from one level to another, works must be carried out in accordance with;
▪ Working at Heights Procedure IMS-02-21
▪ Civil Construction SWMS IMS-10-25 – Working above 2m Section
Working on or adjacent to a Road
Traffic is a major hazard. Working around or near traffic works must be carried out in accordance with;
▪ Civil Construction SWMS IMS-10-25 – Working on or adjacent to a Road Section
Where a traffic management plan (TMP) or Traffic guidance scheme (TGS) have been developed for the project
it is important that monitoring and implementation of these plans, are evidenced in the PCP. It is the
responsibility of the Project Manager to ensure the relevant and appropriate TMP/TGS’s are in place for the
project. It is the responsibility of the Supervisor to ensure plans are implemented and monitored. It will be the
responsibility of the Compliance Advisor to audit and inspect.
Working in or adjacent to Water
IMS-04-01_P – Reviewed – September 2020 Document Uncontrolled When Printed Page 25 of 60