Lake MacDonald Drive Cooroy - WMP
Workplace Management Plan
Lake MacDonald Drive, Cooroy
All works conducted in or near water, must be carried out in accordance with;
▪ Civil Construction SWMS IMS-10-25 – Working in or Adjacent to Water Section
Electrical Safety General
All Electrical works must be carried out by qualified persons and in accordance with;
▪ Electrical Safety Procedure IMS-02-04
▪ Tag and Lockout Procedure IMS-02-15
▪ Civil Construction SWMS IMS-10-25 – Electrical Safety, General Works, Hot Works Section
Working near Overhead Power
All works conducted near Overhead Power must be carried out in accordance with;
▪ Electrical Safety Procedure IMS-02-04
▪ Crane Operations Procedure IMS-02-33
▪ Civil Construction SWMS IMS-10-25 – Working Near Overhead Power Section
Quick Cut Saws
All works conducted with Quick Cut Saws must be carried out in accordance with:
▪ Quick Cut Saws Procedure IMS-02-27
▪ Civil Construction SWMS IMS-10-25 – Quick Cut Saw Section
Refuelling of Small Plant and Equipment
Refuelling of Small Plant and Equipment must be carried out in accordance with:
▪ Refuelling of Small Plant and Equipment Procedure IMS-02-26
▪ Civil Construction SWMS IMS-10-25 – Refuelling of Small Plant and Equipment Section
Recovery of Bogged Vehicles
Recovery of bogged vehicles must be carried out in accordance with:
▪ Civil Construction SWMS IMS-10-25 – Recovery of Bogged Vehicles Section
Working near Underground Services
All works conducted near underground services, must be carried out in accordance with;
▪ Excavation Procedure IMS-02-05
▪ Electrical Safety Procedure IMS-02-04
▪ Civil Construction SWMS IMS-10-25 – Working Near Underground Services Section
▪ Excavation Permit IMS-05-17
14. EMERGENCY PREPAREDNESS AND RESPONSE
A competent Emergency Management Team is in place for this project. The Emergency Management Team
consists of an Emergency Warden, Emergency Officer, and First Aid Officer. Roles and responsibilities of the
Emergency Management Team are outlined in section 6 of this Plan. All members of the team will be inducted
into the sites Emergency Management Plan IMS-04-02 and on the Emergency Management Team induction
form IMS-05-96. The induction will be conducted by the Emergency Warden.
Emergency Management Plan
IMS-04-01_P – Reviewed – September 2020 Document Uncontrolled When Printed Page 26 of 60