Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Lake MacDonald Drive Cooroy - WMP

of 61

Page text shows just the words. Original shows the document exactly as it was published.

                                                                     Workplace Management Plan
                                                                  Lake MacDonald Drive, Cooroy

•    Cement Spreading:

     ▪ Record the required spread rate as per specification or instructions

     ▪ Record actual spread rate

▪    Mixing

     ▪ Mix the cement and in-situ material to a depth of 200mm or as per specifications, whilst conditioning for
       moisture

     ▪   Compaction

     ▪   Use minimum required equipment for desired compaction

▪    Trim

     ▪   Trim surface to the desired height as per specifications or instructions




IMS-04-01_P – Reviewed – September 2020    Document Uncontrolled When Printed                         Page 45 of 60
Log in to download the original file

Lake MacDonald Drive Cooroy - WMP.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.