Original source · versioned page text
Minor Change Existing Approval - 132002.220212.3 (As Published).pdf
9. Only one Fig tree located along the western property boundary of the site is to be removed
and is to be relocated generally to the right of the pedestrian entrance to the units off Noosa
Drive. A qualified arborist must supervise works associated with the removal and relocation
of this tree. Root guards are to be installed when the tree is relocated. Should the tree be
damaged during this process, a replacement fig tree (minimum 1000L bag size) is to be
provided at full cost to the developer and to the satisfaction of the Manager - Environmental
Services.
10. Any fencing provided in conjunction with the development is to be setback an average of two
(2) metres to any road frontage.
11. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
11.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
11.2. Disposal for firewood.
11.3. Disposal for landscaping purposes.
11.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application
for a Development Permit for Operational Works. The Applicant is advised that other methods
may be considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
12. Any advertising sign or device is to comply with the provisions of Council's policies on
advertising.
13. The developer is to contribute one third of the cost of undergrounding the existing overhead
powerlines for the Noosa Drive frontage of the property. The developer is responsible to
liaise with Council’s Manger - Works Design about attaining an estimated costs for this work.
This contribution is to be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contribution not be paid at the due time, Council shall call upon the trading bank guarantee
in full.
14. Security in the form of a cash bond or trading bank guarantee to the sum of $200 000 must
be submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
15. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
16. This Development Permit for a material change of use of premises lapses if:-
16.1. the use or erection of a building or other structure associated with the use, has not
been commenced by 17 October 2006, unless application is made and approved by
Council for an extension; or
16.2. the use of any premises pursuant to the Development Permit ceases.
17. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
Page 3 of 14
Document Set ID: 25012091
Version: 5, Version Date: 29/07/2026
[OCR of page images]
10.
11.
12.
13.
14.
15.
16.
17.
Only one Fig tree located along the western property boundary of the site is to be removed
and is to be relocated generally to the right of the pedestrian entrance to the units off Noosa
Drive. A qualified arborist must supervise works associated with the removal and relocation
of this tree. Root guards are to be installed when the tree is relocated. Should the tree be
damaged during this process, a replacement fig tree (minimum 1000L bag size) is to be
provided at full cost to the developer and to the satisfaction of the Manager - Environmental
Services.
Any fencing provided in conjunction with the development is to be setback an average of two
(2) metres to any road frontage.
Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
11.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
11.2. Disposal for firewood.
11.3. Disposal for landscaping purposes.
11.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application
for a Development Permit for Operational Works. The Applicant is advised that other methods
may be considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
Any advertising sign or device is to comply with the provisions of Council's policies on
advertising.
The developer is to contribute one third of the cost of undergrounding the existing overhead
powerlines for the Noosa Drive frontage of the property. The developer is responsible to
liaise with Council’s Manger - Works Design about attaining an estimated costs for this work.
This contribution is to be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contribution not be paid at the due time, Council shall call upon the trading bank guarantee
in full.
Security in the form of a cash bond or trading bank guarantee to the sum of $200 000 must
be submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
This Development Permit for a material change of use of premises lapses if:-
16.1. the use or erection of a building or other structure associated with the use, has not
been commenced by 17 October 2006, unless application is made and approved by
Council for an extension; or
16.2. the use of any premises pursuant to the Development Permit ceases.
The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
Page 3 of 14
Document Set ID: 25012091
Version: 5, Version Date: 29/07/2026
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.