Town Planning Report and Appendices - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Response column key:
5.2 Constructing or raising waterway barrier works in fish habitats state code Achieved
P/S Performance solution
N/A Not applicable
Table 5.2.1: Operational work
Performance outcomes Acceptable outcomes Response Comment
All assessable waterway barrier works
The proposed works involve the AO1.1 The development ensures that one or more of the The proposed works involve the replacement of an existing
replacement of an existing culvert. The following is achieved: culvert. The proposed works will not create a barrier to fish
proposed works will not create a barrier (1) the waterway barrier works includes a fish way that movement and will continue to provide passage for water
to fish movement. adequately provides for the movement of fish across and fish post-construction/
the barrier works, or Generally, these works would be considered self assessable
(2) the movement of fish across the waterway barrier against the Code for self-assessable development – Minor
works is, adequately provided for in another way, or waterway barrier works – Part 3: culvert crossings. However
in this instance, vegetation clearing (including roots) is
(3) the height of the waterway barrier works allows required, triggering referral under Schedule 7 – Table 2 –
enough water to flow across the barrier works to Item 29 of the Sustainable Planning Regulation 2009.
adequately provide for the movement of fish across
the barrier works, or
(4) the waterway barrier works is intended to exist only
for a temporary period, and the level of disruption to
fish movement in the area is acceptable, or
(5) it is not necessary or desirable, for the best
management, use, development or protection of
fisheries resources or fish habitats, for the waterway
barrier works to provide for the movement of fish
across the barrier works.
And
AO1.2 Suitable habitat conditions, such as water and The proposed works involve the replacement of an existing
sediment quality, will be maintained to sustain the health culvert. The proposed works will not create a barrier to fish
and condition of fisheries resources within all fish habitats. movement.
And As the works involve the placement of a structure within a
waterway, it is recognised that there may be potential
impacts on aquatic species associated with construction,
such as disturbance to fauna during construction activities,
displacement of aquatic fauna due to noise and vibration
impacts and unintended impacts on surrounding vegetation
or habitat.
Any potential impacts on aquatic ecology are proposed to be
managed through mitigation measures including:
• All works will be undertaken in accordance with the
guidelines presented within the Code for self-
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 1 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.