Performance outcomes Acceptable outcomes Response Comment
assessable development – Minor waterway barrier
works – Part 3: culvert crossings;
• Construction works will be done during periods of
low rainfall or when the stream is dry. This will
minimise the potential impacts associated with
scouring, erosion and sedimentation. In addition, it
will minimise impact to aquatic species that may
normally be located within the subject site when it
is inundate;
• Alternatively, the waterway can be temporarily
blocked and drained to allow for construction in dry
conditions. A spotter-catcher would be required to
be present during drainage works to ensure the
safe relocation of fauna from the waterway to
further downstream. The waterway will be
reinstated post construction works.
• Works will be limited to the minimum disturbance
area as far as practicable; and
• There will be no additional temporary waterway
barrier works associated with construction. All
construction materials and machinery will be stored
within designated laydown areas away from the
waterway. Stockpiles will be protected by suitable
drainage diversion structures and/or covered to
minimise contact with rainfall and/or stormwater.
AO1.3 Cumulative effects of waterway barrier works do The proposed works involve the replacement of an existing
not impede fish movements, and will not affect culvert. The proposed works will not impede fish
reproductive success, health or mortality by depleting fish movements.
energy reserves.
And
AO1.4 Fish will not become trapped or stranded as a The proposed works involve the replacement of an existing
result of development. culvert. The proposed works will not create a barrier to fish
Or movement and therefore will not result in fish becoming
stranded or trapped.
AO1.5 Risks of fish stranding occurring have been The proposed works involve the replacement of an existing
identified and are demonstrably manageable. culvert. The proposed works will not create a barrier to fish
movement and therefore do not pose a risk of fish stranding.
PO2 Development maintains or AO2.1 The development does not impact on existing The proposed works will not have an impact on the
enhances the community access to infrastructure or access required by commercial or operations and productivity of commercial or recreational
fisheries resources and fish habitats, recreational fishing. fisheries.
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 2 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.