Town Planning Report and Appendices - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Performance outcomes Acceptable outcomes Response Comment
accurately documented and it cannot be demonstrated
that impact can be reasonably avoided or minimised, an
environmental offset is provided for any significant
residual impact.
Editor’s note: Applications for development should identify
whether there is likely to be a significant residual impact and a
need for an environmental offset having regard to Section 3.8
(Waterway providing for fish passage) of the Significant Residual
Impact Guideline and the relevant Queensland Environmental
Offsets Policy.
Incorporation of fish ways
PO11 Where the waterway barrier works No acceptable outcome is prescribed. N/A The proposed works will not create a barrier to fish
will be a barrier to fish movement, movement. Therefore the provision for a fish way is not
provisions are made for adequate fish required.
movement by incorporating a fish way or
fish ways for the works.
PO12 Any fish way proposed as part of AO12.1 A person or entity that is suitably qualified and N/A A fish way is not proposed as part of this application.
the development is demonstrated to be a experienced in fish passage biology and fish way design
feasible and reliable solution that will and delivery demonstrates and verifies that any fish way
provide adequate fish passage. design will provide adequate fish passage.
Editor’s note: Further information about the And
importance of fish passage and design
considerations can be found in the book From AO12.2 Development uses a fish way design that has N/A Refer to Response AO12.1.
sea to source: International guidance for the been successfully implemented under similar conditions
restoration of fish migration highways. (such as flows and fish communities) and has been
demonstrated to provide adequate fish passage through
actual scientific monitoring.
And
AO12.3 Development provides for the installation of N/A Refer to Response AO12.1.
monitoring equipment, such as traps and lifting
equipment, access for monitoring, and a monitoring
program of sufficient rigour to:
(1) demonstrate the success of the fish way and fish
passage at the site
(2) provide the basis for optimising operation of the
works and fish way.
And
AO12.4 The fish way design maximises flexibility for N/A Refer to Response AO12.1.
future adjustments that may be needed once in place.
And
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 7 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.