Town Planning Report and Appendices - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Performance outcomes Acceptable outcomes Response Comment
AO12.5 The owner or operator demonstrates the means N/A Refer to Response AO12.1.
and commitment to promptly rectify any faults found in the
fish way during commissioning, monitoring and operation,
if these lead to inadequacies in the fish movement that
are provided.
And
AO12.6 Any tailwater control structures such as a gauging N/A Refer to Response AO12.1.
weir, rock bar or stream crossings are fitted with a fish
way or designed to allow fish passage.
And
AO12.7 Any existing in-stream structure downstream of N/A Refer to Response AO12.1.
the proposed waterway barrier works, which increases the
barrier effect to fish passage through changes in flow
characteristics, is fitted with adequate fish passage
facilities.
PO13 Lateral (upstream and AO13.1 More than one fish way is provided, for example, N/A Refer to Response AO12.1.
downstream) and longitudinal fish to provide up and downstream fish passage or to provide
movement is provided for. fish passage under a range of flow regimes.
PO14 Any fish way is be capable of AO14.1 The operational range of a fish way is sufficient N/A Refer to Response AO12.1.
operating whenever there is flow in the having regard to the hydrology of the site and the fish
waterway (inflow or release), the dam is movement characteristics (in particular timing of
above dead storage level, and the fish movements in relation to seasons and hydrographs).
way will be operational for as long as the And
waterway barrier is in position.
AO14.2 The lower operational range of the fish way is N/A Refer to Response AO12.1.
down to at least 0.5 metres below minimum headwater
drawdown level (dead storage or minimum off-take level,
whichever is lower) and to at least 0.5 metres below
minimum tail water level at the site.
And
AO14.3 Upstream and downstream fish ways will be N/A Refer to Response AO12.1.
operated whenever there are inflows into the
impoundment or release out of the impoundment, and
during overtopping events.
And
AO14.4 All releases are directed firstly through the fish N/A Refer to Response AO12.1.
way as a priority over the outlet works, with the fish way
being operated whenever a release is made through it,
regardless of whether the release volume is less than the
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 8 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.