Performance outcomes Acceptable outcomes Response Comment
for the whole fish community taking into works is well understood and catered for.
account species, size classes, life-stages And
and swimming abilities.
AO18.2 The fish way design, operation and capacity will N/A Refer to Response AO12.1.
avoid or acceptably minimise any delays in fish
movement.
PO19 Development does not increase AO19.1 All pathways providing fish passage at a N/A Refer to Response AO12.1.
the risk of mortality, disease or injury, or proposed waterway barrier works are safe for fish to pass.
compromise the health and productivity And
in fish.
AO19.2 Fish passage will not adversely impact on the N/A Refer to Response AO12.1.
wellbeing of fish.
And
AO19.3 The designs of all components of waterway N/A Refer to Response AO12.1.
barriers, including but not limited to spillway, stilling basin,
apron and dissipation structures, are developed and
implemented with safe downstream fish passage as a key
design consideration.
Note: A stepped spillway (including sheet pile weirs) is not an
acceptable solution as high mortalities and injuries to fish have
been associated with such designs.
And
AO19.4 There is adequate minimum tailwater depth at the N/A Refer to Response AO12.1.
toe of the spillway (for example, stilling basin) at
commencement to spill (for example, 30 per cent of the
head difference).
And
AO19.5 Intake and outlet works adjacent to the waterway N/A Refer to Response AO12.1.
barrier are screened or otherwise designed and placed to
prevent fish passing through or becoming trapped in these
works.
And
AO19.6 Intake screen dimensions are such that small fish N/A Refer to Response AO12.1.
are not drawn through the outlet works and velocities are
low enough that fish are not impinged or entrained on the
screens.
And
AO19.7 The fish way exit is located so as to avoid N/A Refer to Response AO12.1.
entrainment in any outlet work screens and avoid fish
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 11 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.