Town Planning Report and Appendices - Cooroibah

Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Performance outcomes                         Acceptable outcomes                                               Response     Comment
                                             AO16.6 Attraction flow velocities are sufficient and              N/A          Refer to Response AO12.1.
                                             variable to attract the whole fish community.
                                             And
                                             AO16.7 Appropriate light levels are maintained at fish way        N/A          Refer to Response AO12.1.
                                             entrances.
                                             And
                                             AO16.8 Additional means of fish attraction are included in        N/A          Refer to Response AO12.1.
                                             the fish way design if appropriate.
                                             And
                                             AO16.9 The fish way entrance is accessible under all flow         N/A          Refer to Response AO12.1.
                                             conditions within its operating range.
                                             And
                                             AO16.10 Fish attracted to the spillway are able to access         N/A          Refer to Response AO12.1.
                                             the fish way without having to swim back downstream.
                                             And
                                             AO16.11 Water supply for the fish ways and attraction             N/A          Refer to Response AO12.1.
                                             flows are sourced from surface quality water or equivalent
                                             quality water.
                                             And
                                             AO16.12 There are adequate holding chamber                        N/A          Refer to Response AO12.1.
                                             dimensions for the fish biomass (for lock, lift, trap and
                                             transfer type fish ways).
                                             And
                                             AO16.13 The fish way has adequate hydraulic conditions            N/A          Refer to Response AO12.1.
                                             for all fish within and throughout the fish ways.
PO17 The seasonal and flow-related           AO17.1 The fish way design, operation and capacity will           N/A          Refer to Response AO12.1.
biomass of the fish community at the         avoid or acceptably minimise failure to pass any members
location of the waterway barrier works       of the fish community, for example, due to size, class or
has been surveyed, and has been              swimming ability.
catered for in the design of the fish way.   And
                                             AO17.2 Future increases in fish biomass are quantified            N/A          Refer to Response AO12.1.
                                             and catered for in the design of the fish way (for example,
                                             in capacity or flexibility of operation).
PO18 Fish ways and other means of fish       AO18.1 The seasonal and flow-related composition of the           N/A          Refer to Response AO12.1.
passage at waterway barrier works cater      fish community at the location of the waterway barrier


State development assessment provisions                                       Module 5 — Fisheries resources          5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9                                                                                                                                                                      Page 10 of 24
Log in to download the original file

Town Planning Report and Appendices - Cooroibah.pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.