Town Planning Report and Appendices - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Performance outcomes Acceptable outcomes Response Comment
adequate for fish passage.
And
AO21.3 Floodgates are designed and operated as (tidally N/A Refer to Response AO21.1.
activated) automatic floodgates.
And
AO21.4 The invert of the floodgate is at bed level. N/A Refer to Response AO21.1.
And
AO21.5 Floodgates allow for fish passage over an N/A Refer to Response AO21.1.
adequate duration of the tidal cycle.
And
AO21.6 The operation of the floodgate will not result in N/A Refer to Response AO21.1.
impacts on water quality that may impact on fish or fish
habitat.
PO22 Waterway barriers that are bridges AO22.1 A bridge that is designed to allow adequate fish N/A A bridge is not proposed as part of this application.
are designed, constructed and passage is preferentially installed to a culvert.
maintained to provide adequate fish And
passage for the site and:
(1) fish passage is provided for the life AO22.2 In-stream bridge structures such as piles are N/A Refer to Response AO22.1.
of the crossing minimised.
(2) hydraulic conditions (depth, And
velocities and turbulence) from the AO22.3 Bridge support piles are not constructed within N/A Refer to Response AO22.1.
downstream to the upstream limit of the low-flow channel or so that they constrict the edges of
the structure allow for fish passage the low-flow channel.
of all fish attempting to move through
And
the crossing at all flows up to the
drownout of the structure. AO22.4 Bridge abutments do not extend into the N/A Refer to Response AO22.1.
waterway beyond the toes of the banks.
Editor’s note: For guidance on when a bridge And
is and is not considered to be waterway barrier
work see the Department of Agriculture, AO22.5 Bank revetment works do not extend into the N/A Refer to Response AO22.1.
Fisheries and Forestry 2014 fact sheets waterway beyond the toes of the banks.
Maintaining Fish Passage in Queensland: And
What is a Waterway Barrier Work? What is not
a Waterway Barrier Work? AO22.6 Permanent access or erosion control structures N/A Refer to Response AO22.1.
within the main channel adjacent to the bridge are set at
or below bed level, roughened to approximately simulate
natural bed conditions, and maintained so that there are
no drops in elevation at their edges or joins with the
stream bed.
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 14 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.