Original source · versioned page text
Town Planning Report and Appendices - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Access and Parking Details
Access to the proposed facility location will be provided via the existing property
access off Jirrima Crescent, and via a proposed extension to the proposed
compound area (total approximately 370 m in length).
For safety reasons, an existing culvert located near the centre of the subject
property is proposed to be replaced, triggering referral for constructing or raising
waterway barrier works, in accordance with Schedule 7, Table 2, Item 29 of the
Sustainable Planning Regulation 2009 (SP Reg). Minor vegetation clearing will be
required for access through the subject property, as well as associated with the
culvert replacement. Refer to Figures 11 and 12 for photographs of the existing
culvert.
Vegetation to be
removed
Figure 11 – Existing culvert to be replaced to allow for safe access to proposed
compound area
Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.