Town Planning Report and Appendices - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
environmental significance, this application will only
and involve the replacement
of the existing culvert.
(3) manages the significant
The proposed works will
adverse environmental
incorporate appropriate
impacts on matters of state
construction controls to
environmental significance
minimise run off from
by protecting the matters of
the work site and
state environmental
minimise works
significance from, or
undertaken within the
otherwise mitigating, those
waterway. Any potential
impacts.
impacts on water are
proposed to be
managed through
appropriate mitigation
measures, and all
works will be in
compliance with the
Code for self-assessable
development, Minor
waterway barrier works,
Part 3: culvert
crossings; and
• All construction
activities will be
managed to avoid any
sediment run-off during
the construction period
in accordance with
nbn’s contractor’s
Construction
Environmental
Management Plan.
Water Quality – Water quality is to ensure The proposed
development is planned, telecommunication facility
• Climatic regions:
designed, constructed and will not negatively impact
stormwater
operated to manage on water quality, for the
management
stormwater and wastewater following reasons:
design objectives
in ways that support the • The need for drainage
protection of environmental and erosion/sediment
values identified in the control measures for the
Environmental Protection construction of the
(Water) Policy 2009. compound is unlikely
given the minor ground
disturbance during the
construction phase.
However, the nbn.
compound foundation
will have a gravel finish
Page 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.