Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                               column 1                                                      column 2
                 Including amendments to 3 July 2017




                                                                          Specific Outcomes                                              Probable solutions
The Noosa Plan



                                                                                  45
                                                       Flooding and drainage
                                                       O8 Buildings and other works are designed and                      S8.1 For new buildings or structures or
                                                                                                                                                         2
                                                       sited to—                                                          additions of more than 50m gross floor area
                                                       a)     provide flood free access to premises and                   to an existing building or structure, floor
                                                              flood free habitable areas;                                 levels for habitable rooms are—
                                                       b)     allow only minor, short term and infrequent                 a)     for areas where minimum floor levels
                                                              flooding of non-habitable areas;                                   are available—not less than the
                                                       c)     ensure carparking areas can be adequately                          specified level;
                                                              drained;                                                    b)     for areas where flood modelling is
                                                       d)     ensure drainage does not adversely impact                          available—a minimum of 300mm
                                                              upon other premises; and                                           above the modelled flood level; and
                                                       e)     ensure filling or excavation does not                       c)     for areas where flood modelling is not
                                                              adversely impact upon other premises by—                           available, a minimum of 300mm above
                                                               i.     causing ponding on the site or nearby                      the highest known flood level;
                                                                      land;                                               AND
                                                               ii.    increasing flooding, which adversely                S8.2 Where Council infrastructure is
                                                                      affects the safety or use of any land               available—
                                                                      upstream and downstream; and                        a)     any drainage (from buildings and land)
                                                               iii.   adversely affecting the flow of water in                   flows to that infrastructure; and
                                                                      any overland flow path.                             b)     the infrastructure has the capacity to
                                                                                                                                 accept any additional loading.
                                                                                                                           AND
                                                                                                                          S8.3      Car parking and maneuvering areas
                                                                                                                          are constructed at a level that permits the
                                                                                                                          parking area to drain from the site by gravity
                                                                                                                          means, without the need for mechanical
                                                                                                                          pumping; or
                                                                                                                           S8.4 Basements for residential uses have
                                                                                                                           flood immunity above the 1%AEP defined
                                                                                                                           flood event where alternative means to
                                                                                                                           mechanical pumping are used to achieve
                                                                                                                           such immunity; or
                                                                                                                          S8.5 Basements for non-residential uses
                                                                                                                          have flood immunity above the 1%AEP
                                                                                                                          defined flood event that may be achieved by
                                                                                                                          means of mechanical pumping only where
                                                                                                                          the mechanical feature is installed with
                                                                                                                          adequate holding tanks and an alternative
                                                                                                                          back up power source.
                                                       Roof form
                                                       O9 Rooflines—                                                       S9.1 The main roof of the building has a
                                                       a)    contribute positively to the local skyline;                   roof pitch no less than 5 degrees and has
                                                       b)    complement the character of the locality;                     minimum 600mm eaves to at least 75% of
                                                       c)    are articulated, pitched or skillion;                         the perimeter of the building;
                                                       d)    avoid low pitched (eg. less than 5 degrees) or                AND
                                                             box profiles/parapets;                                       S9.2 Buildings and structures do not include
                                                       e)    do not create opportunities for residents to                 roof top terraces.
                                                             overlook the private open space areas of
                                                             neighbouring properties.




                                                       45
                                                         Information on minimum floor levels and flood levels for some parts of the Shire is available from Council. These
                                                       provisions are not limited to areas shown as Flood Hazard Areas on overlay maps 1.3-9.3.



                                                                                                                  5-28
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.