Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                      column 1                                                       column 2




                                                                                                                                         Including amendments to 3 July 2017
                Specific Outcomes                                                Probable solutions




                                                                                                                        The Noosa Plan
                          68
Flooding and drainage
O14 Buildings and other works are designed                        S14.1 For new buildings or structures or
                                                                                               2
and sited to—                                                     additions of more than 50m gross floor area to
a)    provide flood free access to premises and                   an existing building or structure, floor levels for
      flood free habitable areas;                                 habitable rooms are—
b)    allow only minor, short term and infrequent                 a)    for areas where minimum floor levels are
      flooding of non-habitable areas;                                  available—not less than the specified
c)    ensure carparking areas can be adequately                         level;
      drained;                                                    b)    for areas where flood modelling is
d)    ensure drainage does not adversely impact                         available—a minimum of 300mm above
      upon other premises; and                                          the modelled flood level; and
e)    ensure filling or excavation does not                       c)    for areas where flood modelling is not
      adversely impact upon other premises by—                          available, a minimum of 300mm above
       i.     causing ponding of water on the site                      the highest known flood level;
              or nearby land;                                     AND
       ii.    increasing flooding, which adversely                S14.2 Where Council infrastructure is
              affects the safety or use of any land               available—
              upstream and downstream; and                        a)     any drainage (including buildings and
       iii.   adversely affecting the flow of water                      yards) flows to that infrastructure; and
              in any overland flow path.                          b)     the infrastructure has the capacity to
                                                                         accept any additional loading;
                                                                  AND
                                                                  S14.3 Car parking and maneuvering areas
                                                                  are constructed at a level that permits the
                                                                  parking area to drain from the site by gravity
                                                                  means, without the need for mechanical
                                                                  pumping; or
                                                                  S14.4 Basements for residential uses have
                                                                  flood immunity above the 1%AEP defined
                                                                  flood event where alternative means to
                                                                  mechanical pumping are used to achieve such
                                                                  immunity; or
                                                                  S14.5 Basements for non-residential uses
                                                                  have flood immunity above the 1%AEP
                                                                  defined flood event that may be achieved by
                                                                  means of mechanical pumping where the
                                                                  mechanical feature is installed with adequate
                                                                  holding tanks and an alternative back up
                                                                  power source.




68
  Information on minimum floor levels and flood levels for some parts of the Shire is available from Council. These
provisions are not limited to areas shown as Flood Hazard Areas on overlay maps OM1.3-9.3.



                                                           6-47
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.