                        column 1                                                        column 2
                    Specific Outcomes                                               Probable solutions




                                                                                                                                   Including amendments to 3 July 2017
Fences




                                                                                                                       The Noosa Plan
O6 Fencing contributes to the bush setting of the                    S6.1 Fencing comprises timber and wire
Noosa North Shore and does not block the views of                    materials rather than the use of solid wall
neighbours.                                                          construction
                           49
Flooding and drainage
O7 Buildings and other works are designed and                       S7.1 For new buildings or structures or
                                                                                                  2
sited to—                                                           additions of more than 50m gross floor area
a)     provide flood free access to premises and                    to an existing building or structure, floor
       flood free habitable areas;                                  levels for habitable rooms are—
b)     allow only minor, short term and infrequent                   a)     for areas where minimum floor levels
       flooding of non-habitable areas;                                     are available—not less than the
c)     ensure carparking areas can be adequately                            specified level;
       drained;                                                      b)     for areas where flood modelling is
d)     ensure drainage does not adversely impact                            available—a minimum of 300mm
       upon other premises; and                                             above the modelled flood level; and
e)     ensure filling or excavation does not                         c)     for areas where flood modelling is not
       adversely impact upon other premises by—                             available, a minimum of 300mm
        i.     causing ponding on the site or nearby                        above the highest known flood level;
               land;                                                 AND
        ii.    increasing flooding, which adversely                 S7.2 Dwelling houses are raised above
               affects the safety or use of any land                ground with a suspended floor, rather than
               upstream and downstream; and                         utilising "slab on ground" construction;
        iii.   adversely affecting the flow of water in             AND
               any overland flow path.                              S7.3 Development minimises the impact of
                                                                    earthworks associated with its building,
                                                                    access and service provision;
                                                                    AND
                                                                    S7.4 Drainage works are designed to
                                                                    disperse stormwater runoff, rather than
                                                                    concentrating it.
                                                                     AND
                                                                    S7.5 Car parking and maneuvering areas
                                                                    are constructed at a level that permits the
                                                                    parking area to drain from the site by gravity
                                                                    means, without the need for mechanical
                                                                    pumping; or
                                                                     S7.6 Basements for residential uses have
                                                                     flood immunity above the 1%AEP define
                                                                     flood event where alternative means to
                                                                     mechanical pumping are used to achieve
                                                                     such immunity; or
                                                                    S7.7 Basements for non-residential uses
                                                                    have flood immunity above the 1%AEP
                                                                    define flood event that may be achieved by
                                                                    means of mechanical pumping where the
                                                                    mechanical feature is installed with
                                                                    adequate holding tanks and an alternative
                                                                    back up power source.




49
   Information on minimum floor levels and flood levels for some parts of the Shire is available from Council. These
provisions are not limited to areas shown as Flood Hazard Areas on overlay maps OM1.3-9.3.



                                                           10-27
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.