Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Specific Outcomes Probable solutions
Including amendments to 3 July 2017
Roof form
The Noosa Plan
O8 Rooflines— S8.1 The main roof of the building has a
a) contribute positively to the local skyline; roof pitch no less than 5 degrees and has
b) complement the beachside and riverside minimum 600mm eaves to at least 75% of
character of the locality; the perimeter of the building.
c) avoid low pitched (eg. less than 5 degrees) or
box roof profiles/parapets; and
d) do not create opportunities for residents to
overlook the private open space areas of
neighbouring properties.
10.10 Environment, conservation and recreation
Environment and cultural heritage values
O9 There are no significant adverse effects on No solution provided
biodiversity, native vegetation, native fauna habitat,
landscape quality, water quality or cultural heritage Editor’s note:
values, including those related to— PSP24 – Effluent Disposal details requirements
a) changes to natural drainage; for the design and siting of effluent disposal
b) disturbance of the dune system and wetland systems where located outside a sewerage
service area. Compliance with PSP24 will be
system; considered as part of Council’s assessment of
c) management of fire risk; the plumbing and drainage application.
d) erosion and the transport of sediments off
site;
Advisory note
e) unmanaged public access;
50 PSP24 – Effluent Disposal details
f) effluent disposal ;
g) changes to fauna habitat and behaviour; and requirements for the design and siting of
h) disturbance of buildings and features, effluent disposal systems where located
including natural features, of cultural heritage outside a sewerage service area.
significance. Compliance with PSP24 will be considered
as part of Council’s assessment of the
plumbing and drainage application.
Open space network
O10 An integrated open space network is S10.1 Open space corridors and existing
established, enhanced and protected throughout native vegetation in areas indicated in
the locality to— Schedule 5 – Map 3 are protected from
a) provide for both passive and active fragmentation and encroachment by
recreational pursuits; development.
b) provide connectivity for pedestrians, cyclists,
and horse riders;
c) provide habitat connectivity for wildlife;
d) protect watercourses and drainage lines;
e) protect vegetation on steep slopes;
a) form a scenic backdrop for residential
development; and
b) provide on road and off road pedestrian and
recreational access, including various sand
tracks formed between the Noosa River in the
south and the landing ground reserve in the
north.
50
Council may request additional information on the proposed method of effluent disposal to ensure the nature of the
development is compatible with environmental values. Refer to PSP1 – Information Council May Request.
10-28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.