column 1 column 2
Specific Outcomes Probable solutions
O15 For the Business Centre Zone, outside of the
Including amendments to 3 July 2017
Mary Street/Thomas Street Precinct the maximum
The Noosa Plan
plot ratio is —
a) 0.8:1 for site areas up to and including
2
2,000m ; plus
b) 0.3:1 for the balance portion of the site area in
2
excess of 2000m .
O16 For the Shire Business Centre Zone, the
maximum plot ratio for development within the
following precincts is —
a) Precincts B1 and B2 combined- 0.5:1;
b) Precinct B3- 0.8;
c) Precinct E1- 0.6;
d) Precinct E2- 0.6;
e) Precinct E3- 0.6, except for Industrial business
uses;
f) Precinct E4- 0.6; except for Industrial business
uses;
g) Precinct E5- 0.6, except for Industrial business
uses;
h) Precinct E6- 0.6;
i) Precinct E7- 0.6;
j) Precinct RES- 0.6; and
k) Precinct REC/MU- 0.1.
71
Flooding and drainage
O17 Buildings and other works are designed and S17.1 For new buildings or structures or
2
sited to— additions of more than 50m gross floor area
a) provide flood free access to premises and to an existing building or structure, floor
flood free habitable areas; levels for habitable rooms are not less than
b) allow only minor, short term and infrequent the specified minimum floor levels;
flooding of non-habitable areas; AND
c) ensure carparking areas can be adequately S17.2 Where Council infrastructure is
drained; available—
d) ensure drainage does not adversely impact a) any drainage (including buildings and
upon other premises; and yards) flows to that infrastructure; and
e) ensure filling or excavation does not b) the infrastructure has the capacity to
adversely impact upon other premises by— accept any additional loading;
i. causing ponding on the site or nearby AND
land; S17.3 For Residential Uses—
ii. increasing flooding, which adversely a) where slab on ground construction is
affects the safety or use of any land used, filling does not extend more than
upstream and downstream; and 1m beyond the building footprint and
iii. adversely affecting the flow of water in access to car parking areas, measured
any overland flow path. from the outer walls of the building ; or
b) the design consists of a suspended floor
construction;
AND
S17.4 Car parking and maneuvering areas
are constructed at a level that permits the
parking area to drain from the site by gravity
means, without the need for mechanical
71
Council has mapping of minimum floor levels and flood levels for some parts of the Shire. Contact the Land Development
Section of Council, Tewantin Office.
11-49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.