Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                  column 1                                             column 2
              Specific Outcomes                             Acceptable solutions (if self-




                                                                                                                    Including amendments to 3 July 2017
                                                    assessableaccepted development subject to




                                                                                                        The Noosa Plan
                                                                    requirements)
                                                     Probable solutions (if code assessablecode
                                                                     assessment)
                                                    e) involve construction of an on-site effluent
                                                         disposal system;
                                                    OR

                                                    S7.2 A site specific geo-technical report
                                                    prepared by a registered professional engineer
                                                    either—
                                                    a)    certifies that the site is not at risk from
                                                          landslide emanating from the site or from
                                                          other land; or
                                                    b)    identifies methods of stabilising all
                                                          buildings, accessways and use areas;
                                                    AND
                                                    S7.3 If the geo-technical report identifies
                                                    methods of stabilising buildings, accessways
                                                    and use areas, those methods are
                                                    implemented.
Water Supply Infrastructure
O8 Existing water supply infrastructure,            S8.1 Buildings and structures are setback a
including pipeline corridor, is protected from      minimum of 20m from a water supply pipeline
incompatible development to ensure the safety       as shown on Overlay Map OM3.5.
and reliability of water supply network.
Gas Pipeline
O9 Adequate separation is provided between          S9.1 No new buildings for the purpose of
the new building works and the gas pipeline         Residential Uses (except for a Detached
shown on Overlay Maps OM3.5 or OM5.5;               house or class 10 building), Education uses,
                                                    Wellbeing uses or Retail business uses are
                                                    within 200m of the gas pipeline shown on
                                                    Overlay Maps OM3.5 or OM5.5;
AND                                                 AND
                                                    S9.2 Any building works for the purpose of
                                                    storage of flammable, explosive or other
                                                    hazardous materials are not within 200m of the
                                                    gas pipeline shown on Overlay Maps OM3.5 or
                                                    OM5.5.

O10 Building works are constructed and              S10.1 No solution provided (no requirement for
operated to avoid damaging or adversely             self-assessableaccepted development
affecting the operation of the pipeline and the     development).
supply of gas.
14.95     Built form
Height
O11 Buildings and other structures–                 S11.1 The maximum building height in storeys
a)   are low rise and present a building height     and metres is—
     consistent with structures on adjoining and    a)   if in the Visitor Mixed Use Zone – 12m
     surrounding land;                                   (but not exceeding 3 storeys);
b)   have a maximum building height of–             b)   if in the Noosa Heads Locality, Attached
      i)    for Visitor Mixed Use Zone - 3               Housing Zone –
            storeys;                                    a) Lot 4 on SP 100064 in Serenity Close
      ii)   if in the Noosa Heads Locality,                    Noosa Heads - 15m (but not
            Attached Housing Zone—                             exceeding 4 storeys); or
            Lot 4 on SP 100064 in Serenity             b) otherwise - 12m (but not exceeding 3


                                                   103
                                          Building Works Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.