Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Acceptable solutions (if self-
The Noosa Plan
assessableaccepted development subject to
requirements)
Probable solutions (if code assessablecode
assessment)
AND
S6.2 The site is not on the contaminated land
register.
Haulage activity and amenity
O7 Haulage of material to and from a site No solution provided
ensures—
a) minimal disturbance to neighbouring
properties and properties along the
haulage route; and
b) Council’s road infrastructure including
pavements is not adversely affected.
Extent of earthworks
O8 Earthworks are contained within the S8.1 All earthworks, including cut and fill
subject property. batters, retaining walls etc are contained within
the subject site.
Sloping sites
O9 On sloping sites, excavation or filling are S9.1 Cut or fill is less than 2m in depth relative
designed to maximise the use of natural slope to the natural ground surface.
and minimise the need for cut and fill.
Environmental protection
O10 Earthworks minimise any adverse impact No solution provided.
upon groundwater, watercourses, drainage
lines, wetlands, and native vegetation.
Dams
O11 Dam location and construction does not S11.1 Where the site is in the Rural Zone—
impact upon neighbouring properties in terms a) the land has a slope of less than 25%
of— (1:4); and
a) hydrology; b) the earthworks including cut and fill batters
b) alteration of existing overland flowpaths and retaining walls are setback a minimum
and patterns; of 50m from the property boundary; and
c) landslide or failure of dam wall; and c) the size of the lot is greater than 5
d) effluent disposal areas. hectares;
AND
S11.2 Where the site is in the Rural Settlement
Zone or the Rural Zone where the lot is less
than 5 hectares—
a) the land has a slope of less than 1:6; and
b) the earthworks including cut and fill batters
and retaining walls are setback a minimum
of 20m from the property boundary; and
3
c) involving less than 500m of material;
AND
S11.3 For all other zones—
No solution provided.
130
Earthworks Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.