Specific Outcomes Probable solutions (if code assessablecode
The Noosa Plan
assessment)
stormwater drainage in a manner that Manual of Urban Traffic Control Devices
allows the road to be trafficable in (MUTCD) Part 9.
Q100 ARI local rainfall events; and
d) verges and footpaths provide—
i. safe access for pedestrians and
cyclists clear of obstructions;
ii. an access area for vehicles onto
properties;
iii. a corridor allocated for services and
utilities; and
iv. additional amenity for minor roads.
O8 Stormwater drainage infrastructure is S8.1 Stormwater drainage planning, design and
planned, designed and constructed to— construction is in accordance with Section 4 of
a) be accessible, cost effective and easily PSP5 Engineering Design Standards – Roads,
maintainable; Drainage and Earthworks;
b) protect downstream capacity; AND
c) protect downstream water quality; S8.2 As Constructed data is submitted in
d) maximise on-site stormwater retention and accordance with Section 6 of PSP5 Engineering
retardation; and Design Standards – Roads, Drainage and
e) convey run-off to stormwater drainage in a Earthworks;
manner that allows roads to be trafficable AND
in Q100 ARI local rainfall events. S8.3 Stormwater drainage planning, design and
construction is in accordance with the
Queensland Urban Drainage Design Manual.
O9 Roads and stormwater drainage S9.1 Roads and stormwater drainage
infrastructure is constructed— infrastructure is constructed in accordance
a) in accordance with appropriate with—
engineering standards; and a) Sections 2, 3 and 4 of PSP5 Engineering
b) to minimise adverse environmental Design Standards – Roads, Drainage and
impacts, including from run-off and Earthworks;
erosion. b) Queensland Design Code for Residential
Streets;
c) AUSTROADS; or
d) A combination of the principles in these
documents;
AND
S9.2 Erosion and sediment control measures
are designed and implemented in accordance
with the Institution of Engineers Australia
(Queensland Division) Soil Erosion and
Sediment Control - Guidelines for Queensland
Construction Sites.
Environmental Protection
O10 Roads and stormwater drainage S10.1 Roads and stormwater drainage follow
infrastructure are located and aligned so as to— the edge of existing disturbed areas, or
a) minimise disturbance to native vegetation alternatively, these works are co-located within
and/or other habitat areas; a combined utility corridor;
b) protect and maintain wildlife corridor AND
movements and the safety of native fauna; S10.2 Roads avoid native vegetation and
c) minimise changes to the hydrological provide for fauna underpasses and associated
regime, including drainage patterns, run-off fencing where appropriate;
and water quality; AND
d) avoid crossing watercourses, drainage S10.3 Road infrastructure within or adjacent to
lines and wetlands, but where such native habitat incorporates fences which allow
crossings are unavoidable, disturbed areas for protected wildlife movement and controls
156
Transport, Roads and Drainage Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.