Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Specific Outcomes Probable solutions (if code assessablecode
Including amendments to 3 July 2017
assessment)
The Noosa Plan
are reinstated and revegetated on unrestricted access of domestic cats and dogs;
completion of works; and AND
e) minimise bulk earthworks. S10.4 Native vegetation is protected from
clearing or construction activities by—
a) clearly marking vegetation to be retained
with flagging tap;
b) installing protective fencing around the
dripline of vegetation; and
c) ensuring stock piling, storage and vehicle
parking occur outside the areas of
vegetation to be retained;
AND
S10.5 Low impact construction techniques are
used around areas of vegetation to be retained
to minimise interference with the vegetation.
O11 Roads and stormwater drainage No solution provided
infrastructure is proven to be suitable for its use
prior to Council accepting the dedicated asset.
O12 Alignment of stormwater drainage S12.1 The location, design and construction of
infrastructure is to allow for easy access for the stormwater drainage structures is in accordance
ongoing maintenance by Council. with Sections 4 and 5 of PSP5, Engineering
Design Standards - Roads, Drainage and
Earthworks;
AND
S12.2 Where infrastructure is located on private
land an easement is dedicated over the
infrastructure in accordance with Section 4 of
PSP 5, Engineering Design Standards – Roads,
Drainage and Earthworks.
14.147 Frontage works
O13 Development is provided with external S13.1 The following infrastructure components
roadworks along the full extent of the frontage of already exist at the frontage of the site or are
the site to an appropriate standard having provided at the developer’s expense—
regard to the specified function of the road. a) full width sealed road;
b) concrete kerb and channel where
appropriate;
c) forming and grading to footpaths;
d) vehicular kerb and footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed carriageway;
h) required alterations to public utility mains,
services or installations;
i) construction of any required alterations to
public utility mains, services or
installations;
j) stormwater drainage works; and
k) installation of electrical conduits;
AND
S13.2 Road and drainage design and
construction is in accordance with Sections 3
and 4 of PSP5 Engineering Design Standards –
Roads, Drainage and Earthworks.
14.148 Road and rail corridors
O14 Noise sensitive uses including residential S14.1 Noise sensitive uses including residential
157
Transport, Roads and Drainage Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.