Assets with high use represent a public liability ——— °
risk to Council if there is deterioration or if ; 7 we
structural failure. A regime of compliance risk sw ¢ ae
i fen ¥ ; rf |
inspections is undertaken, however data needs iS i Nt oak
to be captured to increase confidence in the Ale. et : sTrT sae Lee
knowledge of asset condition from the current 5 oe j= ee =
low to moderate level. ~ S e _
Renewal of these assets is currently reactive 4 ’ :
and based on defects detected during routine rial a ty ;
inspections. A prioritised approach to renewals d ad oe
is more desirable.
Total number of assets = 1697
Current written down value = $22.8m
Current replacement cost = $28.4m Age profile
2014/15 depreciation costs = $ 853k In analysing the age profile for parks,
2014/15 maintenance costs = $ 2.25m playground and reserve infrastructure the first
2015/16 capital renewal program $ 311k observation within the profile is the significant
Critical assets — playground equipment, asset value for 2005.
landscaping, nature reserves@nd foreshore In 2005:a proactive asset data collection
parks programme was for collecting park furniture,
> playground and park assets. The majority of the
assets identified had the acquisition date of the
_ year it was captured recorded. This approach
This first generation asset management plan ‘does not reflect the true age of 75% (1,278) of
rovides an initial snapshot of Council’s parks lpeapesieniees
P P "7 . The majority of these assets are lower valued
playgrounds and reserves infrastructure. Through assets such as park benches, picnic tables,
this plan, major risks and priorities will be identified bollards, BBQs, playground equipment and
through the improvement of asset management shelters. It is recommended that greater
> consideration be given to these assets and their
practices. In the future, the development of next fae ;
remaining lives when they are re-inspected.
generation asset management plans will provide
far greater detail.
These assets consist of a multitude of assets and ai
include assets such as playground equipment, * Asset Age Profile
sports fields, nature reserves, parks, barbecues, s
10,000
landscaping, shelters, park furniture, shade sails 9 annals
“
ae <<”
and skate facilities. z 6,000
5 4,000
” 2,000 {
0 j B aa i fl ( i i
DM £2 KV ODA AV AD AD
DD O7 ODO PVE
MAD AD AD AD AD AD AD'AD A979 729
eee Ved Required ¥ mee
Document Set+B:-+99618
Version: 5, Version Date: 01/10/2015
Page 16 of 25See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.