Overview ee } tia 2 Ls ee
Pathway and boardwalk assets have high use 7 ae : 3 W a vs Share
and therefore represent a public liability risk to may tie. ¢ Be) eS - .
Council if there are trip hazards or structural oe ie a Hr " ate. %
failure. A regime of cyclical hazard and u bibs t\ n
structural risk inspections is undertaken however k a Ty
data needs to be captured on the asset system =
to increase confidence in the knowledge of asset as .
condition from the current level. ES
Renewal of these assets is currently reactive and a
based on defects detected during routine / ff
inspections. A prioritised approach to renewals :
is required. if
Total number of Assets = 2,835 ; .
Total length of pathway and boardwalks = 231km . ;
Current replacement cost = $ 44.4m , ,
Current written down value = $ 39.8m ‘ ,
2014/15 depreciation = $711k | Age profile
2014/15 maintenance program = $ 392k . | fy
2015/16 capital renewal program = $ 263k ». In analysing, eu age pantie for parks,
Critical assets — Main Beach and ParkRoad playground and reserve infrastructure the first
boardwalks, Gympie Tce foreshor pathwayystrategic “J sobservation within the profile is the significant
pathway networks and school,Zones” nok, (asset Vall@for 2005.
et y ) ~ In 2005, a proactive asset data collection
programme was undertaken for collecting
Ra \infrastructure data including pathway and
This first generation asset management plan | © Doardwalk assets. The majority of the assets
provides an initial snapshot of Council's | » identified had the acquisition date of the year it
ea and eee oe ee was captured recorded. This approach does not
this plan, major risks and priorities will be reflect the true age of 87% (2,488) of all assets
identified through the improvement of asset in thi ti = ; - ae b
management practices. In the future, the eee a en eee oe :
development of next generation asset assessed to determine the actual construction
management plans will provide far greater detail. year.
These assets include concrete pathways, off road
shared pathways, boardwalks, pathway lighting
and bollards.
9 Asset Age Profile
o
>
% = 30,000
28
< §, 20,000
ij
2 10,000
S 0 _t ts i - 2.
D2 LV o_O WD AY AV AD AO
PPP PoP PnP Parnas
MD? O° OH Se A ey
Year Acquired
Document Set ID: 19961826
Version: 5, Version Date: 01/10/2015
Page 18 of 25See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.