Minor Change Report MCU25 0057 01, OPW25/0078.01 & RAL25/0010.01 [As Published]

of 20

Page text read automatically using OCR, there may be inaccuracies

               Assessment of Request
               It was requested that the submitted Engineering plans be amended to be RPEQ certified, noting
               that the original approved Engineering Plans were RPEQ certified. The Further Matters response
               included amended Engineering Plans that were RPEQ certified.
               The updated Landscaping Plans prepared by Metricon have been endorsed as part of this minor
               change and it is noted that the plan amendments required in Condition 1 of the Operational Works
               permit have been demonstrated. Front fencing/walls are setback at least 1.5 metres from the front
               boundary allowing for meaningful landscaping.
               The updated Landscaping Plans also include the requested Corymbia Tessellaris adjacent to the
               George Street frontage.

               Recommendation
               It is recommended existing condition 1 be amended to read as follows:
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development.

                         Plan No.          Rev.       Plan/Document Name                       Date

                         00469-OW3.1           B      Earthworks Plan, Prepared by SCG 19/06/2026
                                                      Consulting Engineers

                         00469-OW4.1           C      Driveway and Access Plan, Prepared by 19/06/2026
                                                      SCG Consulting Engineers

                         00469-OW4.2           B      Driveway Details, Prepared by SCG 19/06/2026
                                                      Consulting Engineers

                         00469-SW1.1           D      Stormwater Management Plan, Prepared 19/06/2026
                                                      by SCG Consulting Engineers

                         090226                V2     Hardscape Plan prepared by Metricon       9/02/2026
                         1 of 3

                         090226                V2     Planting Plan prepared by Metricon        9/02/2026
                         2 of 3

                         090226                V2     Details Plan prepared by Metricon         9/02/2026
                         3 of 3


               Existing Condition 3 – Development Permit for Reconfiguring a Lot
               3.     Approved Plans
               Development authorised by this approval must be undertaken generally in accordance with the
               Approved Plans listed in the table/s below.

                        Plan No.           Rev.     Plan/Document Name                         Date

                        01                 -        Subdivision Plan prepared by JL            12/05/2025

               Applicant’s Request
               The applicant has requested existing Condition 3 be amended to the following:

                                                                                                 Page 14 of 20

Document Set ID: 24926353
Version: 9, Version Date: 10/08/2026

Log in to download the original (Minor Change Report MCU25 0057 01, OPW25_0078.01 & RAL25_0010.01 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.