Council archive · source document
SPA Decision Notice - 010.2010.00000515.001 [As Published] · 152010.515
2010/515
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Existing Vegetation
3. The existing Melalueca species along the eastern boundary of the site shall be retained.
4. Vehicular pavements within the drip zone of the existing Melalueca species along the eastern
boundary shall be designed as a pervious pavement (such as grass paving cells or similar).
This will allow water that falls on this surface to penetrate to the trees root system. The
pavement shall be constructed so as not to damage the tree or their root system, in this regard
temporary fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
5. Trimming of overhanging branches of the Melalueca species trees along the eastern boundary
for access shall be carried out pursuant to an arborist report approved by Council.
6. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use.
7. All trees above 2m in height shall be retained, until an application for building works has been
approved for proposed lot 2.
Relevant Period
8. The relevant period is four (4) years from the day this permit takes effect and ends on
21 July 2014. During which time all conditions must have been complied with, operational
works completed, and the Plan of Survey lodged with the Council for endorsement.
Operational Works Assessment
Plan of Survey
9. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation must be presented to Council and submitted in the correct form with the fees
prescribed in Council's adopted fee schedule.
10. All outstanding rates and charges due and payable to Sunshine Coast Regional Council in
respect of the lots being reconfigured must be paid prior to endorsement of the Survey Plan.
11. Any changes required by Council’s Solicitor must be attended to prior to endorsing the Plan of
Survey. Any necessary Titles Office forms requiring the consent of Council is to be submitted
prior to the endorsing of the Plan of Survey.
12. Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil
Engineer shall be submitted to Council for each Development Permit for Operational Works
issued pursuant to this permit. The engineer shall certify those works and that they have been
completed in a workman like manner in accordance with good engineering practice and in
accordance with that permit.
Vehicle Access
13. A vehicle access to proposed Lot 1 shall be constructed from the eastern property boundary in
Wyandra Street. The access shall be a commercial standard and shall:
13.1 Be located between the two melalueca species trees on the eastern boundary generally
as shown on drawing number 094787-Rev 4 prepared by Cadcon dated 20 May 2010;
13.2 Extend from the property boundary to the edge of the formation of the existing
carparking area; and
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000515.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 61 KB (small file)
- File type
No other editions are linked here.