13.3 Be aligned and linemarked along the southern end of the carparking area to provide the
necessary width (6 metre maximum) and maintain the maximum number of parking
spaces.
In this regard plans detailing this work shall be prepared and submitted to Council for approval
prior to obtaining a Development Permit for Operational Works.
14. As part of the Building Works Approval, a Road/Footpath Permit in accordance with Council’s
Local Law No.8 shall be completed and submitted for the construction of the access driveway
to proposed Lot 2. The access shall:
14.1 Be located along the Delorme Street frontage. No vehicle access is permitted to
Wyandra Street;
14.2 Extend from the edge of the road formation in Delorme Street to the property boundary;
14.3 Be located clear of any existing services and footpaths; and
14.4 Be constructed in accordance with Council’s standard drawings, which will be provided
at time of approval.
15. All paths, driveways and parking areas shall be designed and constructed to ensure
pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to
be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1
Design for Access & Mobility.
16. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to Council endorsing the Plan of Survey.
Power Supply
17. An electricity service shall be provided to each Lot unless already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with the Sunshine Coast Regional Council (SCRC) CEO delegate to prepare detailed designs
of the electrical proposal.
The detailed designs shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to SCRC in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to SCRC endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of the proposed lots.
18. All redundant services, and any services that stand within another lot, shall be removed prior
to Council endorsing the Plan of Survey.
Telecommunications
19. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of new telephone services to the proposed lots. In this regard written confirmation
from an approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan of Survey.
20. All redundant services, and any services that stand within another lot, shall be removed prior
to Council endorsing the Plan of Survey.
Roof Water & Stormwater Drainage
21. Stormwater runoff from proposed Lot 1 shall be connected to Council’s existing drainage
system in Wyandra Street.
22. Stormwater runoff from proposed Lot 2 shall be connected to Council’s existing drainage
systems in Wyandra Street and Delorme Street.
Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000515.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 61 KB (small file)
- File type
No other editions are linked here.