Project Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThe Principal Contractor will provide the following waste receptacles
Skips
Wheelie bins
Garbage chutes
Other (provide details below)
Other (details)
All subcontractors must
Ensure work areas are left clean and tidy at the end of each work shift
Ensure any liquid spills which may present a slip hazard are barricaded off and cleaned up immediately
Ensure wheelie bins are emptied into the skips provided when full
Adopt a ‘clean as you go’ policy
Place all waste in separate recycling skips, as required
Provide suitable lock-up and storage facilities in their allocated areas for their tools, materials and equipment (e.g. gang-boxes,
lockable cabinets, portable sheds or shipping containers)
Ensure all tools, materials, plant and equipment are stored within the site boundary
Store all dangerous goods and hazardous chemicals in safe locations and ensure all relevant signs and labels are in place
Other conditions (provide details below)
Other conditions
Note: Non-compliance with these procedures could result in back-charges to the subcontractor.
3.3.2 Site security
The Principal Contractor will provide the following measures to prevent unauthorised access to site
1.8 metre high perimeter fence
Timber hoardings
Lockable gates, doors and hatches to site access points and Principal Contractor supplied plant and machinery
After hours security patrols
Anti-climbing barriers to tower crane base sections
Other (provide details below)
Other (details)
Security cameras
Subcontractors will be responsible for ensuring any mobile plant is locked away after hours with:
Ignition keys removed;
Booms lowered (where applicable);
Telescopic booms retracted (where applicable); and
The machines stored on level stable ground.
3.4 Delivery, lifting and handling of materials and equipment
3.4.1 Site deliveries
Delivery of all materials shall be coordinated via the Principal Contractor to ensure no disruption to critical activities (e.g.
concrete pours, crane erection and dismantling, etc.); and
All materials should arrive on site in appropriate containers or packaging to facilitate safe lifting and cranage.
Site deliveries shall be via Designated delivery areas on site
The construction zone or other specified location (as listed below)
Construction zone or other location details
WHSMP-C 01/2018.8 Initials Page 11 of 39
____ ____
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.