Project Management Plan

Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.4.2 Lifting equipment
Lifting equipment supplied by the Principal Contractor
Unless already provided by the subcontractor through prior agreement, the principal contractor will provide the following
equipment for the lifting and handling of materials and equipment
   Brick cage/s
   Crane/s (mobile)
   Crane/s (tower)
   Forklift/s
   Hoist/s (formwork)
   Hoist/s (personnel and/or materials)
   Loading bays (cantilevered)
   Loading bays (scaffold)
   Material boxes with lifting points
   Satellite boom/s (concreting only)
   Skips
   Telehandler/s
   Other (provide details below)
Other (details)

       Inspection details should be recorded in the ‘Crane lifting & fall-arrest equipment inspection register’ (see supporting
       documents)
Lifting equipment supplied by the subcontractor
Subcontractors will provide the following equipment for the lifting and handling of materials and equipment associated with their work
   Brick cage/s
   Crane/s (mobile)
   Crane/s (tower)
   Forklift/s
   Hoist/s (formwork)
   Hoist/s (personnel and/or materials)
   Loading bays (cantilevered)
   Loading bays (scaffold)
   Material boxes with lifting points
   Satellite boom/s (concreting only)
   Skips
   Telehandler/s
   Other (provide details below)
Other (details)

Inspection of lifting equipment
       All crane-lifting points on plant, equipment, pre-cast/tilt-up concrete panels and formwork shutters must be designed and
       approved by a qualified engineer, as per relevant standard.
       Lifting equipment must be visually inspected prior to use each day and inspected and tagged by a competent person.


3.5 Works on roads and footpaths (where applicable)
3.5.1 Principal Contractor's responsibilities
The Principal Contractor has determined by risk assessment that
  The following additional traffic management measures will be implemented            No traffic control or additional traffic
management is required for this work site




WHSMP-C 01/2018.8                                              Initials                                                    Page 12 of 39

                                                 ____                          ____
Log in to download the original file

Project Management Plan.pdf · 350 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.