Project Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3.4.2 Lifting equipment
Lifting equipment supplied by the Principal Contractor
Unless already provided by the subcontractor through prior agreement, the principal contractor will provide the following
equipment for the lifting and handling of materials and equipment
Brick cage/s
Crane/s (mobile)
Crane/s (tower)
Forklift/s
Hoist/s (formwork)
Hoist/s (personnel and/or materials)
Loading bays (cantilevered)
Loading bays (scaffold)
Material boxes with lifting points
Satellite boom/s (concreting only)
Skips
Telehandler/s
Other (provide details below)
Other (details)
Inspection details should be recorded in the ‘Crane lifting & fall-arrest equipment inspection register’ (see supporting
documents)
Lifting equipment supplied by the subcontractor
Subcontractors will provide the following equipment for the lifting and handling of materials and equipment associated with their work
Brick cage/s
Crane/s (mobile)
Crane/s (tower)
Forklift/s
Hoist/s (formwork)
Hoist/s (personnel and/or materials)
Loading bays (cantilevered)
Loading bays (scaffold)
Material boxes with lifting points
Satellite boom/s (concreting only)
Skips
Telehandler/s
Other (provide details below)
Other (details)
Inspection of lifting equipment
All crane-lifting points on plant, equipment, pre-cast/tilt-up concrete panels and formwork shutters must be designed and
approved by a qualified engineer, as per relevant standard.
Lifting equipment must be visually inspected prior to use each day and inspected and tagged by a competent person.
3.5 Works on roads and footpaths (where applicable)
3.5.1 Principal Contractor's responsibilities
The Principal Contractor has determined by risk assessment that
The following additional traffic management measures will be implemented No traffic control or additional traffic
management is required for this work site
WHSMP-C 01/2018.8 Initials Page 12 of 39
____ ____
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.