Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Project Management Plan

Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.6 General rules for workers, subcontractors and others
All persons on site must:
       Follow all safety precautions and instructions given at the work site by representatives of the Principal Contractor, the
       workers’ employer and government inspectors, or an elected HSR for the worker’s work group (where applicable);
       Comply with all procedures and instructions in accordance with the WHS Management Plan and site emergency plan;
       Wear any PPE when required to do so;
       Raise concerns about health and safety promptly with the appropriate person on site;
       Report any unsafe conditions, plant and procedures as soon as possible;
       Comply with any safety signs posted at the work site;
       Unless authorised to do so, not enter areas of the work site that:
              Have been barricaded off or have signs restricting entry (e.g. formwork stripping areas);
              Are subject to a permit system (e.g. confined spaces);
              Have lockable gates and hatches to restrict entry (e.g. tower cranes, plant rooms,electrical switch-rooms, lift cores);
              or
              Are part of a climbing formwork system (e.g. slip and jump forms, Climbtrac systems, and any trailing decks
              associated with the system)
              Report any injury, illness or dangerous incident that may affect or involve the person to the safety personnel
              nominated in this WHS Management Plan;
              Not use or interfere with any plant or equipment which:
                        Has been locked out or isolated by service/maintenance personnel
                        Is fitted with ‘Danger’ or ‘Out of Service’ tags;
                        Does not have current registration, if the plant is required to be registered; and/ or
                        Is found to be unsafe.

In addition to the rules listed above, all company staff, subcontractors and workers must:
       Visually inspect any plant or equipment for defects prior to use;
       Use mechanical lifting aids, when provided and practicable to use, rather than manually handle materials;
       Familiarise themselves with and comply with any SWMS or safety procedures applicable to the worker’s work;
       Keep work areas clean and tidy;
       Wear sun-protective clothing and/or accessories (sunglasses, sunscreen, etc.) when working outdoors; and
       Not work within any exclusion zones around power lines unless authorised to do so.
Additional rules for visitors
Visitors must
   Sign in and out of the visitor’s log book located in the site office
   Complete a site induction before entering any part of the work site other than the site offices
   Be accompanied by a site inducted person before entering any part of the work site other than the site offices
   Not enter work areas without appropriate PPE
   Other (provide details below)
Other (details)




WHSMP-C 01/2018.8                                              Initials                                                Page 30 of 39

                                                ____                          ____
Log in to download the original file

Project Management Plan.pdf · 350 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.