Log in to see the plans as drawn Tools and equipment must not be taken into the crib rooms;
Where kitchen facilities have been provided, the area must be cleaned immediately after use and all utensils put away;
Any food kept in the refrigerators:
Must be either covered or kept in sealed containers; or
Will be discarded, along with its container, if found to be mouldy, spoilt or otherwise unfit for human consumption.
4.10.2 Toilets
Toilets will be cleaned regularly, but workers are expected to use them hygienically and with courtesy for other users;
Workers should notify a representative of the Principal Contractor where supplies of soap, paper towels or toilet paper are
depleted; and
Wash basins must not be used for cleaning plant and equipment. Designated areas and facilities will be provided for this
(e.g. paint washout areas, concrete pump cleaning, etc.).
4.11 Plant
4.11.1 Power tools
Cutting and grinding tools must not be used unless guards are fitted and functioning;
Cutting and grinding discs and blades must be compatible with the tool being used (e.g. maximum rated speed or RPM
must not be less than the maximum RPM of tool);
Multi-cutter blades must not be used in angle grinders;
Free-flight explosive power tools must not be used on site;
Explosive power tool cartridges and spent cases must be locked away and not disposed of using site waste receptacles and
facilities; and
Toxic dust generating power tools must be used with dust suppression (e.g. brick saws, wood saws, petrol saws, concrete
cutting and grinding equipment, etc.).
4.11.2 Tower cranes
Tower cranes are present on this work site Yes No
4.11.3 Loading bays (scaffolding and cantilevered)
Loading bays are in use on this work site Yes No
Any loads placed on loading bays must not exceed the safe working load marked on the bay;
Materials on loading bays are not to be stacked above the height of the handrails;
Climbing on to the load above the handrail height is strictly prohibited; and
Approaching or working adjacent to the exposed edge of the loading bay when the gates are in the open position is strictly
prohibited unless an approved travel-restraint system is used.
4.11.4 Personnel and materials hoists
Hoists are in use on this work site Yes No
WHSMP-C 01/2018.8 Initials Page 32 of 39
____ ____
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.