SPECIAL MEETING AGENDA 26 APRIL 2018
Page 17 of 42
SPECIAL MEETING AGENDA 26 APRIL 2018
STAFF REVIEW - LGIP SUBMISSIONS (6 March to 18 April 2018)
Submission Date Submission Details Staff Review Staff
No. Received Recommendation
3 16/04/2018 |The submission requests an additional This submission is similar to earlier correspondence to Council dated 12 March 2018 (ref: RM2018/04897) where No change to the
by mail alternate pathway be provided to the Council's Infrastructure Planning, Design & Delivery Manager responded on 19 March 2018 advising: There
5 1 1 1 6 23 2905 547 45 17 0 are
5 1 1 1 6 24 2961 547 36 17 0 no
5 1 1 1 6 25 3044 540 69 24 58 |Draft
5 1 1 1 6 26 3124 540 73 24 89 LGIP
5 1 1 1 6 27 3209 540 55 30 96 (v2)
5 1 1 1 6 28 3275 547 33 17 96 as
4 1 1 1 7 0 660 581 2490 31 -1
5 1 1 1 7 1 660 581 119 24 96 Pomona
5 1 1 1 7 2 791 581 177 31 96 showground
5 1 1 1 7 3 982 581 21 24 95 in
5 1 1 1 7 4 1017 581 47 24 96 lieu
5 1 1 1 7 5 1077 581 33 30 95 of,
5 1 1 1 7 6 1123 588 28 17 94 or
5 1 1 1 7 7 1163 581 21 24 94 in
5 1 1 1 7 8 1290 581 81 24 95 funds
5 1 1 1 7 9 1382 581 132 24 96 allocated
5 1 1 1 7 10 1523 581 24 24 96 in
5 1 1 1 7 11 1559 581 43 24 96 the
5 1 1 1 7 12 1615 581 119 24 96 2017/18
5 1 1 1 7 13 1743 581 122 24 96 financial
5 1 1 1 7 14 1873 588 67 24 96 year
5 1 1 1 7 15 1948 581 40 24 96 for
5 1 1 1 7 16 1995 581 125 31 96 pathway
5 1 1 1 7 17 2128 581 125 31 96 planning
5 1 1 1 7 18 2264 581 24 24 96 in
5 1 1 1 7 19 2299 581 129 24 94 Pomona.
5 1 1 1 7 20 2441 581 122 24 94 Pomona
5 1 1 1 7 21 2573 581 126 31 96 pathway
5 1 1 1 7 22 2706 581 126 31 96 planning
5 1 1 1 7 23 2842 581 71 24 96 does
5 1 1 1 7 24 3043 581 107 31 96 publicly
4 1 1 1 8 0 658 622 2543 31 -1
5 1 1 1 8 1 658 622 112 24 96 addition
5 1 1 1 8 2 782 623 35 29 96 to,
5 1 1 1 8 3 830 622 156 31 96 completing
5 1 1 1 8 4 999 622 45 24 96 the
5 1 1 1 8 5 1056 622 141 31 96 remaining
5 1 1 1 8 6 1291 629 105 24 95 appear
5 1 1 1 8 7 1403 622 24 24 95 in
5 1 1 1 8 8 1439 622 43 24 96 the
5 1 1 1 8 9 1494 622 67 24 96 draft
5 1 1 1 8 10 1570 622 17 24 96 5
5 1 1 1 8 11 1596 629 67 24 96 year
5 1 1 1 8 12 1671 622 96 31 96 capital
5 1 1 1 8 13 1777 622 85 24 96 works
5 1 1 1 8 14 1871 629 121 24 95 program
5 1 1 1 8 15 2005 622 24 24 96 in
5 1 1 1 8 16 2041 622 44 24 95 the
5 1 1 1 8 17 2097 622 154 24 95 2022/2023
5 1 1 1 8 18 2262 622 122 24 95 financial
5 1 1 1 8 19 2392 629 70 24 96 year,
5 1 1 1 8 20 2476 622 106 31 96 subject
5 1 1 1 8 21 2591 623 26 23 96 to
5 1 1 1 8 22 2628 622 102 31 96 budget
5 1 1 1 8 23 2739 622 210 24 95 deliberations.
advertised.
missing link to the Pomona school.
The submission relates to the pathway project identified as PW-712 on LGIP-PFTI
5 1 1 1 10 13 2540 705 140 30 95 Transport
5 1 1 1 10 14 2688 705 64 30 95 Map
5 1 1 1 10 15 2763 705 31 24 81 5”
5 1 1 1 10 16 2811 705 51 24 96 and
5 1 1 1 10 17 2874 705 113 24 96 detailed
5 1 1 1 10 18 3001 705 22 24 95 in
4 1 1 1 11 0 1294 747 1708 30 -1
5 1 1 1 11 1 1294 747 90 24 96 Table
15.16 - Transport network schedule of works" for completing the final missing link along Clay Street (includes
Marquee Lane i.e. Clay St-West) to the Summit Road intersection of the school. It is not a proposal for duplication of
existing pathways on Council managed land however the final design may take into account some of the existing
paths on school property pending further consultation with the school.
In relation to the comment made regarding pedestrian access from the town centre to the showgrounds, the existing
designated trunk pathway provides access from Factory Street through Cooroora Creek Park and then along the full
Pavillion Street frontage of the showground site and therfore already serves this purpose.
The alternative proposal being in addition to the existing route, is considered unnecessary for the current LGIP
planning horizon however may be reconsidered further in the next 5 year LGIP review.
The assertion made by the submitter that completing a pathway missing link for the benefit of school children for
regular use on a daily basis is of lesser importance and priority than for an additional alternative access to that
already provided to a particular site is not supported.
4 16/04/2018 |The submission relates only to This submission has no relevance to the proposed LGIP under the current Noosa Plan 2006. No change to the
by mail |"commercial building design guidelines However, the submission has been forwarded to the Strategic Planning Team for further consideration in Draft LGIP (v2) as
for Pomona”. development of the New Planning Scheme. publicly advertised
5 17/04/2016 |The submission suggests The
5 1 1 1 26 7 1289 1643 63 24 89 This
5 1 1 1 26 8 1363 1643 162 24 96 submission
5 1 1 1 26 9 1538 1643 70 24 96 does
5 1 1 1 26 10 1621 1644 48 31 96 not
5 1 1 1 26 11 1679 1643 80 24 96 relate
5 1 1 1 26 12 1770 1643 104 31 96 directly
5 1 1 1 26 13 1884 1644 27 23 96 to
5 1 1 1 26 14 1922 1650 16 17 96 a
5 1 1 1 26 15 1949 1643 109 31 93 specific
5 1 1 1 26 16 2070 1643 73 24 92 LGIP
5 1 1 1 26 17 2156 1643 74 24 96 issue
5 1 1 1 26 18 2243 1643 44 24 96 but
5 1 1 1 26 19 2297 1650 118 24 96 appears
5 1 1 1 26 20 2426 1644 26 23 96 to
5 1 1 1 26 21 2464 1643 34 24 96 be
5 1 1 1 26 22 2510 1650 73 17 96 more
5 1 1 1 26 23 2594 1643 29 24 95 of
5 1 1 1 26 24 2631 1650 17 17 96 a
5 1 1 1 26 25 2660 1643 108 31 95 product
5 1 1 1 26 26 2779 1643 142 31 96 marketing
5 1 1 1 26 27 3044 1643 38 24 96 No
5 1 1 1 26 28 3094 1643 107 31 96 change
5 1 1 1 26 29 3211 1644 26 23 96 to
5 1 1 1 26 30 3247 1643 46 24 96 the
4 1 1 1 27 0 481 1685 2827 30 -1
5 1 1 1 27 1 481 1685 42 23 94 via
5 1 1 1 27 2 538 1685 81 23 74 Your
|amendment should include the allowance jexercise for consideration of alternative construction design solutions. It has therefore been forwarded to the Draft LGIP (v2) as
Say Noosa" |of synthetic turf to Nature strips as Infrastructure Planning, Design & Delivery and Strategic Planning Teams for consideration if suitable for citing in a publicly advertised
website __ [installed correctly will not cause trip future planning scheme policy on engineering standards.
portal hazards and will require very little
maintenance."
Page 17 of 42See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.