Skip to the record
The gold standard in government transparency.

Council archive · source document

Development Application part 2 of 2 plans - MCU13/0080

of 68

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (51.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                       ~
3’May2013
18 Sunsee   r   Crose                                                                  the certifier
                                    b) Where more than 3
                                    bedrooms    -




                                    60,000 litres;
                                    AND
                                    c) There is to be on the lot a
                                    dam, swimming pool or water
                                    tank accessible for use by the
                                    fire brigade that contains at
                                    least 5,000 litres of water


                                    Advisory note
                                    The 5,000 litres required can be
                                    included within the water required
                                    in S4.2 or S5.1 providing it is
                                    accessible for the purpose of fire
                                    fighting at all times and not used for
                                    other domestic purposes.


Erosion and sediment control        No solution provided.                    Relevant .conditions of
06 Development does not
                                                                             approval related to Erosion
cause erosion or result in          Advisory Note
                                                                             and Sediment Control can be
                                    Persons undertaking development,
transport of sediments off-site.
                                    including building work, are             included in the development
                                    required under the Environmental         permit.
                                    Protection (Water)Policy
                                    1997 (EPP)to ensure that sediment
                                    and other material including             The proposal will comply
                                    building waste, sawdust, concrete,
                                    cement or paint are not
                                    deposited or released into a
                                    roadside gutter, stormwater drain or
                                    waterway, or into a place where it
                                    could reasonably be expected
                                    to move or be washed into a
                                    roadside gutter, stormwater drain or
                        \
                        "
                                    waterway and are not washed from
                                    the site. Council enforces the
                                    EPP and penalties may apply.



Safety and security                 S7.1 The building entrance is            The proposal does not comply
07For Multiple Housing              clearly identifiable and visible         with the probable solutions as
Types 2, 3 and 4,                   from the street, footpath
                                                                             the entries are located to the
buildings and outdoor spaces        and driveway;
                                                                             side of units 2 & 3. Units 1 & 2
are designed to protect the         AND
                                                                             have entrances that pass
personal security and safety of     S7.2 The internal path network
residents by allowing for natural   has clear sightlines to the              through outdoor living areas.
surveillance.                       dwelling entry and street                The entrance of unit 1 is visible
                                    access points;                           from the street and has
                                    AND
                                                                             passive surveillance from the
                                    S7.3 Visitors have direct access
                                    to the entrance without passing
                                                                             living areas of the unit.
                                    through private outdoor living
                                    areas.                                   Passive surveillance of the
                                                                             entries are available to and
                                                                             from units 2 & 3. The design is
                                                                             considered to protect the

                                                                             personal security and safety of


                                                        24

Used in these records

About this file

File size
51.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 of 2 plans - MCU13_0080.pdf · 51.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.