3’May2013
18 Sunsee r Crose the certifier
b) Where more than 3
bedrooms -
60,000 litres;
AND
c) There is to be on the lot a
dam, swimming pool or water
tank accessible for use by the
fire brigade that contains at
least 5,000 litres of water
Advisory note
The 5,000 litres required can be
included within the water required
in S4.2 or S5.1 providing it is
accessible for the purpose of fire
fighting at all times and not used for
other domestic purposes.
Erosion and sediment control No solution provided. Relevant .conditions of
06 Development does not
approval related to Erosion
cause erosion or result in Advisory Note
and Sediment Control can be
Persons undertaking development,
transport of sediments off-site.
including building work, are included in the development
required under the Environmental permit.
Protection (Water)Policy
1997 (EPP)to ensure that sediment
and other material including The proposal will comply
building waste, sawdust, concrete,
cement or paint are not
deposited or released into a
roadside gutter, stormwater drain or
waterway, or into a place where it
could reasonably be expected
to move or be washed into a
roadside gutter, stormwater drain or
\
"
waterway and are not washed from
the site. Council enforces the
EPP and penalties may apply.
Safety and security S7.1 The building entrance is The proposal does not comply
07For Multiple Housing clearly identifiable and visible with the probable solutions as
Types 2, 3 and 4, from the street, footpath
the entries are located to the
buildings and outdoor spaces and driveway;
side of units 2 & 3. Units 1 & 2
are designed to protect the AND
have entrances that pass
personal security and safety of S7.2 The internal path network
residents by allowing for natural has clear sightlines to the through outdoor living areas.
surveillance. dwelling entry and street The entrance of unit 1 is visible
access points; from the street and has
AND
passive surveillance from the
S7.3 Visitors have direct access
to the entrance without passing
living areas of the unit.
through private outdoor living
areas. Passive surveillance of the
entries are available to and
from units 2 & 3. The design is
considered to protect the
personal security and safety of
24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 plans - MCU13/0080Related documentApplication case desk ↗
About this file
- File size
- 51.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.