ORDINARY MEETING MINUTES 15 JANUARY 2015
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
Signage
23. All advertising signage must comply with the Advertising Devices Code.
Waste Management
24. Refuse storage, removal and collection facilities must be provided in
accordance with the following:
a. provision of separate bins (240l wheelie bins or 1.1 m3 bulk bins) for
general and recyclable waste for the site
b. collection by service vehicles from the kerbside of the internal common
property road frontage
c. provision of a hardstand impervious area within the site for the permanent
storage location of the bins, having minimum dimensions of 0.36 m2
(600mm x 600mm) per bin
d. provision of a 1.5m high purpose built enclosure to the storage location
which is screened from the street
e. provision of a wash-down area in the vicinity of the permanent storage
location fitted with a hose-cock and a drain connected to the sewer that
has a stormwater catchment area of no more than 1m².
OPERATIONAL WORKS
Prior to Commencement of Works
25. Council must be contacted at least 5 working days prior to any works
commencing to organise a prestart. The contact number to arrange a pre-start
meeting is 5329 6244. The pre-start meeting must include the relevant parties
for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works
26. A Construction Management Plan must be submitted to Council prior to the pre-
start meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
(i) A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
(ii) Maintenance of safe pedestrian access across the frontage of the
site both during daily construction and after daily construction has
ceased
(iii) Proposed fencing to the site during the construction phase of the
development
(iv) Adequate parking arrangements for construction workers
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures
c. Works program identifying key components of the works and their
respective durations
d. Establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
construction times, impacts on traffic and services and other relevant
issues
Page 11 of 21