Original source · versioned page text
2015-01-15 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 15 JANUARY 2015
27. Any conflict between the development and an existing or proposed service
must be referred to the relevant service authority for determination prior to
commencement of works.
During Construction
28. The developer must meet any costs to repair damage to any Council asset
during construction, where damage is a result of the development works.
Damage to assets must be repaired immediately where it creates a hazard to
the community. In circumstances where the damage does not create a hazard
to the community, it must be repaired immediately on completion of the works
associated with the development. A condition report including photographs of
the Rene Street frontage of the site should be completed and submitted to
Council at the prestart meeting.
29. All works must be supervised by a Registered Professional Engineer of
Queensland (RPEQ) who is independent of the Developer and Principal
Contractor, and they must certify that all works conform to the Operational
Works permit. Where municipal works are involved, such confirmation must be
submitted for the respective hold points prior to any site inspection by Council
Officers.
30. All works must be constructed in accordance with:
a. The approved plans/documents and conditions detailed in this Decision
Notice
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines
c. The latest version of the Healthy Waterways document “Water Sensitive
Urban Design Technical Design Guidelines for South East Queensland”
for all water quality devices to be constructed on site.
Bioretention Basins
31. During construction and establishment of the bioretention devices, the
supervising RPEQ must certify that the device was constructed in accordance
with Construction and Establishment Guidelines: Swales, Bioretention Systems
and Wetlands (Water by Design, 2009) and that the forms contained in section
3.15 of the guidelines, including the associated supporting information and
data, are completed. These forms and certification must be submitted to
council prior to commencement of use.
32. A construction hold point with a council delegate must be established once the
contributing catchment is effectively stabilised with at least 80% groundcover,
and bioretention device underdrainage pipe work is installed.
33. At the time of the construction holdpoint, a sample of the drainage layer,
transition layer, and filtration media materials must be stockpiled onsite
accompanied by laboratory results that demonstrate that the media complies
with the specifications contained in the latest version of the Guidelines for Soil
Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration)
and that the minimum hydraulic conductivity of 180mm/hr or as specified on the
approved engineering plans will be achieved.
34. The bioretention underdrains and cleanout points must be provided as uPVC
pipe generally as shown on IPWEAQ Standard DrawingWSUD-003.
35. Where the bioretention filter media interfaces with stormwater pits and retaining
walls, nonwoven geotextile must be fixed to the pit/retaining wall and extend
300mm out into the filter media generally in accordance with IPWEAQ Standard
Drawing WSUD-001 to prevent tunnelling of water along the interface.
Page 12 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.