ORDINARY MEETING MINUTES 15 JANUARY 2015
36. All overflow pits within the bioretention devices must be provided with letterbox
type grates in accordance with IPWEAQ Standard Drawing WSUD-001.
37. A minimum of five of the following species must be planted in the bioretention
basin surface at a minimum density of 8 plants/m2:
a. Carex appressa.
b. Carex fascicularis.Ficinia nodosa.
c. Juncus usitatis.
d. Lomandra longifolia.
e. Ghania sieberiana.
38. Where landscaping/garden beds are proposed adjacent to the bioretention
basin, a 900mm deep root barrier must be installed to the interface between the
landscape/garden area and the bioretention basin.
39. Following Construction - Prior to issuing of a final compliance certificate, council
must receive evidence that the results for the in situ hydraulic conductivity
testing conducted in accordance with PRACTICE NOTE 1: In Situ
Measurement of Hydraulic Conductivity (FAWB, April 2008) for the bioretention
filter media achieve the design criteria.
40. Maintenance - All stormwater quality treatment devices must be maintained in
accordance with the Maintaining Vegetated Stormwater Assets, Version 1
(Water by Design, 2009). Records of all maintenance activities undertaken
must be kept and made available to council upon request.
Erosion and Sediment Control
41. Erosion and sediment control measures must be installed and maintained to
minimise erosion on the site and to minimise the export of sediment and
associated pollutants from the site. The erosion and sediment control measures
must be designed, installed and maintained in accordance with current best
practice standards.* Any waters discharged from the site in a 43mm rainfall
event or less must contain less than 50mg Total Suspended Solids per Litre.
(*refer to advisory notes)
42. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable
measures as detailed within the International Erosion Control Association Best
Practice Erosion and Sediment Control Document (2008) are taken to prevent
or minimise the release and concentration of contamination.
43. Prior to the the issue of the Certificate of Classification, all site surfaces must be
effectively stabilised using methods which have achieved effective short-term
stabilisation and which will continue to achieve effective stabilisation in the
medium to long-term (refer to advisory notes). For the purpose of this condition,
an effectively stabilised surface is defined as one that does not, or is not likely
to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
lead to sedimentation, or lead to water contamination.
44. Any exposed areas must be effectively stabilised without delay and prior to
rainfall occurring.
Works Within Road Reserve/Reinstatement
45. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
Page 13 of 21