Noosa on Weyba
Flood Study
                                                                                              ~,.,CardnO.

Hollett Road Upgrade (Hollett Road West)

The minimum road level will need to be set at 7.35 mAHD.                10 year ARI flood immunity is proposed with
PMF trafficability.

The existing low flow pipe should be   replaced with 3/1200 by 450 RCBCs (upstream IL       6.55 mAHD,    =



downstream IL = 6.50 mAHD, length = 12m).      Approximately 12 metres to the west 3/1200 by 450 RCBCs
(upstream IL   6.65 mAHD, downstream IL
                     =                          6.60 mAHD, length
                                                        =
                                                                     12m) should also be installed. No
                                                                                  =



excavation beyond the road reserve will be required.

For the  previous development application for this section of the site a drainage channel located on the
northern side of the Hollett Road was proposed, to improve local drainage. This would  require clearing of
vegetation.  For this application this drainage  channel has not been  included, and larger culverts have
instead been utilised to provide sufficient flood immunity. This will minimise the amount of vegetation
clearance required.

Easement Crossing

This crossing is not required for access purposes for the site.               However, it could potentially be utilised by
existing properties around Lake Entrance Boulevard and Aspera Place as an alternative flood access route,
as 70    properties in this area are inaccessible during a 2 year ARI event and above.

The minimum road level will be set at 4.30 mAHD. 10 year ARI flood immunity is proposed with 100 year
ARI trafficability.

The proposed culvert is a 1/1500 by 1500 RCBCs (upstream IL = 2.00 mAHD, downstream IL = 1.95 mAHD,

length    =
              15m).
Tidswell Road Crossing

An upgrade of Tidswell Road is proposed as a secondary access route for the development. It is proposed
that the existing track will be upgraded by Council, as a cost to the subject development, so that 5 year ARI
flood immunity is provided, as required for rural roads. The minimum road level will be raised from around
3.40 mAHD to 4.15 mAHD.

The proposed culverts include 3/1500 by 600 RCBCs (upstream IL = 3.30 mAHD, downstream IL = 3.15
mAHD, length          =
                          15m) and 1/1500 by 600 RCBC (upstream IL       =    3.35 mAHD, downstream IL = 3.10 mAHD,

length    =
              15m).
Southern Keyser Creek Crossing

This crossing of the creek will link Precincts F and G       using the route of an existing rural dam wall. The
minimum road level was set at 3.15 mAHD. It is proposed that this crossing have 100 year ARI flood
immunity (with climate change). This crossing will not be trafficable during a PMF event, but alternative
access for Precinct F is provided along the fire trail located along the southern boundary of the site. This fire

trail will therefore need to be formalised so that it can perform this function.

The culverts will consist of 7/3000 by 1500 RCBCs (upstream IL                    =   0.90 mAHD, downstream IL       =   0.85
mAHD, length  35m). Approximately 30 metres to the east a 2700 by 1200 RCBC (upstream IL
                      =                                                                                              =   1.35

mAHD, downstream IL 1.30 mAHD, length
                               =
                                        12m)will be installed to drain local flows in this area.
                                                    =




The entry and exit losses were assumed to be 0.4 and 0.7 as wingwalls between 30 and 70 degrees will be
utilised, and scour resistant outlet pad will be installed (refer Section 7.16.2 of QUDM).

Northern Keyser Creek Crossing (Hollett Road East)

This crossing of the creek will provide access to Precincts A, B, C, D and E. The minimum road level is 4.00
mAHD.         It is proposed that this crossing have 100 year ARI flood immunity (with climate change) and be
trafficable during a PMF event.            The culverts will consist of 7/3300 by 1500 RCBCs (upstream IL = 0.85
mAHD, downstream IL            =   0.80 mAHD, length = 35m).

The entry and exit losses were assumed to be 0.4 and 0.7 as wingwalls between 30 and 70 degrees will be
utilised, and scour resistant outlet pad will be installed (refer Section 7.16.2 of QUDM).




Northbrook Corporation Pty Ltd                              Version 1                                         23 October 2012
Flood Study v1.doc                                 Commercial in Confidence                                          Page 20

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.