Noosa on Weyba
Flood Study
                                                                                           ~,.,CardnO.

event. Therefore if necessary, this road level could be lowered to approximately 3.83 mAHD, and it would
still be trafficable in a PMF event.

The southern crossing of Keyser Creek has 100 year ARI flood immunity (with climate change).                  It is not
trafficable during a PMF event.

The Tidswell Road upgrade has 5 year ARI flood immunity, and it is trafficable in a 100 year ARI event (not

including climate change). During a PMF event, it has a depth of flow of approximately 730mm across it,
and is therefore not trafficable.

From the developed case results, it is clear that the impact of filling required for lots and road crossings is
that peak water levels are increased within the site for major flood events and              immediately upstream of
upgraded road crossings. Due to the steep rise in surface levels upstream of Lot 11, the increase in peak
water levels within Lot 11 does not           impact on upstream properties.      In minor events, there    are    some

decreases in peak flood levels within the site and downstream. This is mainly due to the invert levels of the

proposed        culverts   being   lower than the   existing tracks, which improves flow conveyance during minor
events, and allows local peaks to exit the site before the peak flow from the remainder of the upstream
catchment arrives.

The developed        case    peak water levels within the 1 D section of the model, i.e. Lake Weyba and Weyba
Creek, are not different from the existing case levels.


8.2       Peak Flows

The developed case peak flows are shown in Appendix G.

J&K Hofmann Site

The easement crossing effectively reduces the peak flows being discharged into Eenie Creek for all ARI
events except for the 1 year ARI event, where there is a slight increase of 0.05  m3/s, which is equivalent to
approximately 2 percent. It should be noted that minor flow attenuation provided by the proposed rainwater
tanks and bio-retention basins is expected to further reduce this peak flow in minor events. The peak flows

directly upstream of the easement are less than the existing case due to the blockage of flows provided by
the crossing.

There are some points within Eenie Creek, upstream of where the site would                 discharge, where the flows
have been shown to be increased by approximately 0.5 percent. This is not considered to be a result of the

development, but rather a small model instability.
It should be noted that detention basins will be required for Precinct L and the northern part of Precinct I.

Northbrook Site

Downstream of Lot 11 the peak flows are less than the existing case for all ARI events. This is due to the
attenuation provided by the culvert crossings of Keyser Creek and its tributary.

At the confluence of Eenie and           Keyser Creek, the peak flows are less than the existing case for all ARI
events.



8.3       Peak Velocities

The developed case peak velocities are shown in Appendix H.

J&K Hofmann Site

The peak velocities within the tributary have been reduced by approximately 0.1 m/s due to the blockage of
flow provided by the easement crossing.

Northbrook Site

The comparison points are located near the culvert inlets, which show localised increases in peak velocities
of approximately 0.5 m/s. Scour protection will be provided in these areas. In general, due to the restriction
of the flood area, the peak velocities are increased           by approximately 0.1 m/s.    The peak velocities in the
western drainage channel are still quite low, at approximately 0.3 m/s.




Northbrook Corporation Pty Ltd                             Version 1                                    23 October 2012
Flood Study v1.doc                                  Commercial in Confidence                                      Page 23

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.