Original source · versioned page text
2016-12-06 Planning & Environment Committee Agenda
The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 DECEMBER 2016
Condition 62 – Earthworks and Site Stability
62. As the site is located below the 20m AHD and above the 5m AHD, any excavation works
consisting of 100m3 or greater which extends below 5m AHD will need to be carried out in
accordance with State Planning Policy 2/02 Planning and Managing Development
Involving Acid Sulfate Soils. In this regard appropriate testing and supporting
documentation prepared by a suitably qualified specialist shall be submitted to Council for
approval prior to obtaining a Development Permit for Operational Works.
Applicant’s request
The applicant requests that the condition be updated to reflect the new State Planning Policy.
Assessment
It is agreed that the condition should be updated to reflect today’s requirements and therefore the
condition should be amended as follows:
62. Where excavations of non-imported soils below the elevation of 5m AHD are necessary for
construction, the application for Operational Works for Bulk Earthworks, Stormwater and/or
Landscaping must demonstrate and include certification from a suitably experienced and
qualified geotechnical engineer of methods necessary to ensure construction and operation
of the development:
a. is consistent with Queensland Acid Sulfate Soil Technical Manual: Soil Management
Guidelines; and
b. will not result in the release of acid or associated metals; and
c. will not cause localised lowering of groundwater.
Conditions 72 & 73 – Environmental Health
72. Adequate and safe access shall be provided to all waste and recycling collection areas for
Council’s Waste Contractors as per Tate Professional Engineers drawing C1732 / F/
SK137-3 Revised G.
73 Adequate storage areas shall be provided for all waste and recycling containers for the
commercial component of the site as per drawings by Starco Developments Pty Ltd dated
August 2006, No 433 – WMO3.
Applicant’s request
The applicant has requested that the condition be amended to remove reference to the
superseded Tate Engineer drawings and refer to the amended plans.
Assessment
Request considered reasonable however, the revised plans do not provide significant detail
about waste or recycling areas for the resort with minimal detail provided for the central facilities.
The condition is recommended to delete reference to the superseded drawings and provide a
waste management plan for the site in accordance with Councils Policy:
72. The development must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including:
a. an external imperviously paved area correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring properties.
Page 55 of 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.