Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Searches

Attached to the e-mail Suspend appeal period & make Change Representations - Dwelling House- MCU22/0032 - 4 Tristania Dr MARCUS BEACH.

of 86

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

     above.You are expected to make your own inquiries and perform your own investigations (including
     engaging appropriately qualified plant locators at your cost to locate nbn Facilities during any activities
     you carry out on site).

We thank you for your enquiry and appreciate your continued use of the Dial Before You Dig Service. If you are
planning to excavate and require further information, please contact nbn on 1800 626 329. For any enquiries
related to moving assets or Planning and Design activities, please visit the nbn Commercial Works website to
complete the online application form.

Notes:

  1. You are now aware that there are nbn Facilities in the vicinity of the above property that could be damaged as a result
     activities carried out (or proposed to be carried out) by you in the vicinity of the Location.
  2. You should have regard to section 474.6 and 474.7 of the Criminal Code Act 1995 (CoA) which deals with the consequences
     of interfering or tampering with a telecommunications facility. Only persons authorised by nbn can interact with nbn's
     network facilities.
  3. Any information provided is valid only for 28 days from the date of issue set out above.




Referral Conditions

    The following are conditions on which nbn provides you with the Indicative Plans. By accepting the plans,you are
    agreeing to these conditions. These conditions are in addition, and not in replacement of, any duties and
    obligations you have under applicable law.
 1. nbn does not accept any responsibility for any inaccuracies of its plans including the Indicative Plans. You are
    expected to make your own inquiries and perform your own investigations (including engaging appropriately
    qualified plant locators at your expense to locate nbn Facilities during any activities you carry out on site).
 2. You acknowledge that nbn has specifically notified you above that the Indicative Plans are likely to be more
    accurate in showing location of fibre optics and telecommunications cables than power cables. There may be a
    variation between the line depicted on the Indicative Plans and the location of any power cables.
 3. You should not assume that nbn Facilities follow straight lines or are installed at uniformed depths along their
    lengths, even if they are indicated on plans provided to you. Careful onsite investigations are essential to locate
    the exact position of cables.
 4. In carrying out any works in the vicinity of nbn Facilities, you must maintain the following minimum clearances:
          300mm when laying assets inline, horizontally or vertically.
          500mm when operating vibrating equipment, for example: jackhammers or vibrating plates.
          1000mm when operating mechanical excavators.
          Adherence to clearances as directed by other asset owner's instructions and take into account any
          uncertainty for power cables.
 5. You are aware that there are inherent risks and dangers associated with carrying out work in the vicinity of
    underground facilities (such as nbn fibre optic,copper and coaxial cables,and power cable feed to nbn
    assets).Damage to underground electric cables may result in:
          Injury from electric shock or severe burns, with the possibility of death.
          Interruption of the electricity supply to wide areas of the city.
          Damage to your excavating plant.
          Responsibility for the cost of repairs.
 6. You must take all reasonable precautions to avoid damaging nbn Facilities. These precautions may include but
    not limited to the following:
          All excavation sites should be examined for underground cables by careful hand excavation. Cable cover
          slabs if present must not be disturbed. Hand excavation needs to be undertaken with extreme care to
Log in to download the original file

Searches.pdf · 12.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.