Original source · versioned page text
Searches
Attached to the e-mail Suspend appeal period & make Change Representations - Dwelling House- MCU22/0032 - 4 Tristania Dr MARCUS BEACH.
The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
minimise the likelihood of damage to the cable, for example: the blades of hand equipment should be aligned
parallel to the line of the cable rather than digging across the cable.
If any undisclosed underground cables are located, notify nbn immediately.
All personnel must be properly briefed, particularly those associated with the use of earth-moving
equipment, trenching, boring and pneumatic equipment.
The safety of the public and other workers must be ensured.
All excavations must be undertaken in accordance with all relevant legislation and regulations.
7. You will be responsible for all damage to nbn Facilities that are connected whether directly, or indirectly with work
you carry out (or work that is carried out for you or on your behalf) at the Location. This will include, without
limitation, all losses expenses incurred by nbn as a result of any such damage.
8. You must immediately report any damage to nbn™ network that you are/become aware of. Notification may be by
telephone - 1800 626 329.
9. Except to the extent that liability may not be capable of lawful exclusion, nbn and its servants and agents and the
related bodies corporate of nbn and their servants and agents shall be under no liability whatsoever to any person
for any loss or damage (including indirect or consequential loss or damage) however caused (including, without
limitation, breach of contract negligence and/or breach of statute) which may be suffered or incurred from or in
connection with this information sheet or any plans(including Indicative Plans) attached hereto. Except as
expressly provided to the contrary in this information sheet or the attached plans(including Indicative Plans), all
terms, conditions, warranties, undertakings or representations (whether expressed or implied) are excluded to the
fullest extent permitted by law.
All works undertaken shall be in accordance with all relevant legislations, acts and regulations applicable to the
particular state or territory of the Location. The following table lists all relevant documents that shall be considered
and adhered to.
State/Territory Documents
Work Health and Safety Act 2011
Work Health and Safety Regulations 2011
National Safe Work Australia - Working in the Vicinity of Overhead and Underground
Electric Lines (Draft)
Occupational Health and Safety Act 1991
Electricity Supply Act 1995
NSW Work Cover NSW - Work Near Underground Assets Guide
Work Cover NSW - Excavation Work: Code of Practice
Electricity Safety Act 1998
VIC
Electricity Safety (Network Asset) Regulations 1999
Electrical Safety Act 2002
QLD
Code of Practice for Working Near Exposed Live Parts
SA Electricity Act 1996
TAS Tasmanian Electricity Supply Industry Act 1995
Electricity Act 1945
WA
Electricity Regulations 1947
Electricity Reform Act 2005
NT
Electricity Reform (Safety and Technical) Regulations 2005
ACT Electricity Act 1971
Thank You,
Network Operations Centre - Assurance
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.