Skip to the record
Every meeting, every word.

Original source · versioned page text

2015-04-28 Infrastructure & Services Committee Agenda

of 100

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                28 APRIL 2015


 The contract for the collection and purchase of ferrous and non-ferrous metals and lead acid
   batteries is currently out for tender.
 The documentation for a Request for Quote is currently being developed for a contract for the
   collection of household hazardous wastes which is due to expire in June. In the 2015/16
   budget it is proposed to not limit the amount of domestic volumes of paint as an incentive to
   promote proper disposal of this product.
 The contract for green waste mulching is due for review before the expiry date in August.
   Extensions to the current contract with ARG are available.

Hastings Street

A small working group has been convened to examine waste collection service issues on
Hastings Street. The group consists of Cr Jurisevic, Ross Sanderson (Infrastructure) Ben
Morrison and Ian Macfarlane (Cleanaway) and Gary Dolton (WMS). A site visit to view services in
progress led to the following items for further investigation and consideration:

 The potential for removing Hastings Street peak period services to relieve traffic disruption.
 Is there a need for a “Precinct Managers” or similar to assist in managing Hasting Street
   waste?
 Options for a centralised pick up zone to keep trucks out of Hastings Street.
 Aggregate pick up points outside retail business that do not open until 9am (after service is
   done)
 Is there potential for public place recycling bins along the street or would this exacerbate
   problems by another truck accessing the street?
 Is there an opportunity for expanding cleaning contractor services along Main Beach?
 WMS to investigate what is best practice in other centres with regard to collection techniques
   in busy/congested and high profile areas
 Is there potential for compactor bins to reduce service frequency?
 Is there a need to clean and apply stickers to bins to clearly identify premises and extra
   services provided for costing?
 Is the presentation of the service vehicles suitable?

The group will meet again in the next month to discuss the issues further and consider a way
forward.




Bins outside Bistro C awaiting collection opposite Aroma’s outdoor Café – example of bins awaiting
servicing and amenity issues for customers at Aromas (odour, diesel fumes, noise).

                                                                                  Page 91 of 100
Log in to download the original file

2015-04-28 Infrastructure & Services Committee Agenda(PDF, 10MB).pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.