Noosa Council documents




                                                                                                          OPW17/0225

                              b.       Landscape works;
                              c.       Erosion and sediment control works;
                              d.       Other relevant parties.
                      8.      Prior to arranging a Prestart meeting for the operational works, a security bond in
                              the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
                              submitted to Council, to secure the performance of all conditions of this approval.
                              The cash bond or trading bank guarantee will be returned on performance of the
                              conditions of approval less any costs incurred by Council in respect of enforcing
                              performance of this permit. Council reserves the right to call upon the bond or
                              guaranteed sum to effect compliance with conditions.
                      9.      Copies of the approved plans, duly signed by the consultant Registered
                              Professional Engineer of Queensland (RPEQ) must be provided to Council’s
                              Engineering Officer Construction at the “prestart” meeting.
                      10.     Condition report/s including photographs must be completed and submitted to
                              Council prior to the prestart meeting and prior to any works commencing:
                              a.       The frontage of the site.
                              b.       All fences bordering the site.
                              c.       Any buildings and structures on the adjoining properties could potentially be
                                       destabilised or impacted on by the proposed works.
                      11.     The principal contractor must have all the appropriate insurance and public liability
                              documentation to carry out the works. The principal contractor is also responsible
                              to ensure that any subcontractors also have the appropriate insurance and public
                              liability documentation. Certificates demonstrating currency of public liability
                              insurance and works insurance covering the works must be submitted to Council
                              prior to the prestart meeting.
                      12.     A Construction Management Plan must be submitted to Council for approval prior
                              to the prestart meeting and must specifically address the following:
                              a.       Traffic Management during all aspects of the construct phase including:
                                        i.    A Traffic Management Control Plan in accordance with Manual of
                                              Uniform Traffic Control Devices (MUTCD) detailing all temporary
                                              signage and traffic control measures prior to construction.
                                       ii.    Maintenance of safe pedestrian access across the frontage of the site
                                              at all times both during daily construction and after daily construction
                                              has ceased.
                                       iii.   Closure of road verge during the construction of the new concrete
                                              pathway.
                                       iv.    Proposed fencing to the site during the construction phase of the
                                              development.
                                       v.     Adequate parking arrangements for construction workers without
                                              adversely impacting on the local traffic or the availability of public
                                              parking spaces.
                                       vi.    No queuing of trucks is permitted on residential streets, especially prior
                                              to 7.00am. Further parked trucks must have engines turned off.
                              b.       Maintenance and protection of water quality and existing drainage lines
                                       through the construction site through the implementation of appropriate
                                       erosion and sediment control measures.


                                                                                                                Page 3 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                   Print Date: 5 September 2017, 4:08 PM

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 1b - OpWorks Decision Notice.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.