Att 1b - OpWorks Decision Notice · 132003.221172.8
Attached to the e-mail Change to DA (23657 DA Duplex Dwelling) - 132003.221172.8 Attachements 132003.221172.7 - 61 Elanda St.msg.
Noosa Council documents
OPW17/0225
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties.
8. Prior to arranging a Prestart meeting for the operational works, a security bond in
the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted to Council, to secure the performance of all conditions of this approval.
The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
9. Copies of the approved plans, duly signed by the consultant Registered
Professional Engineer of Queensland (RPEQ) must be provided to Council’s
Engineering Officer Construction at the “prestart” meeting.
10. Condition report/s including photographs must be completed and submitted to
Council prior to the prestart meeting and prior to any works commencing:
a. The frontage of the site.
b. All fences bordering the site.
c. Any buildings and structures on the adjoining properties could potentially be
destabilised or impacted on by the proposed works.
11. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible
to ensure that any subcontractors also have the appropriate insurance and public
liability documentation. Certificates demonstrating currency of public liability
insurance and works insurance covering the works must be submitted to Council
prior to the prestart meeting.
12. A Construction Management Plan must be submitted to Council for approval prior
to the prestart meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction.
ii. Maintenance of safe pedestrian access across the frontage of the site
at all times both during daily construction and after daily construction
has ceased.
iii. Closure of road verge during the construction of the new concrete
pathway.
iv. Proposed fencing to the site during the construction phase of the
development.
v. Adequate parking arrangements for construction workers without
adversely impacting on the local traffic or the availability of public
parking spaces.
vi. No queuing of trucks is permitted on residential streets, especially prior
to 7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures.
Page 3 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1b - OpWorks Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.