Negotiated Report (Representations made) MCU25 0118 (As Published) · MCU25/0118
SK-8-2 G Elevations, prepared by Hollindale 4 December
Mainwaring Architecture 2025
SK-8-3 G North Elevation Detail, prepared by 4 December
Hollindale Mainwaring Architecture 2025
SK-9-1 G Sections, prepared by Hollindale 4 December
Mainwaring Architecture 2025
SK-9-2 G Sections, prepared by Hollindale 4 December
Mainwaring Architecture 2025
SK-9-3 G Sections, prepared by Hollindale 4 December
Mainwaring Architecture 2025
SK-9-4 G Sections, prepared by Hollindale 4 December
Mainwaring Architecture 2025
SK-10-a G Unit A Plans, prepared by Hollindale 4 December
Mainwaring Architecture 2025
SK-10-c G Unit C Plans, prepared by Hollindale 4 December
Mainwaring Architecture 2025
SK-10-d G Unit D & Type E Plans, prepared by 4 December
Hollindale Mainwaring Architecture 2025
SK-11-1 G Perspectives, prepared by Hollindale 4 December
Mainwaring Architecture 2025
SK11-3 G Perspectives, prepared by Hollindale 4 December
Mainwaring Architecture 2025
Sk-11-4 G Perspectives, prepared by Hollindale 4 December
Mainwaring Architecture 2025
24228 I Landscape Concept Plan Package, November
prepared by Project Urban 2025
Applicant’s Request
The applicant has requested existing condition be amended to reflect the revised plans and has
provided the following justification.
Since responding to Council’s information request in late 2025, Coast2Bay have progressed
detailed design with input from additional technical consultants, including building certifier,
mechanical and hydraulic engineering. Advice on fire servicing has been sought from MRP
Hydraulic & Fire Services Consultants on the likely infrastructure requirements to ensure that
the development can be safeguarded in the event of a fire. Usually, at this stage of the design,
a flow and pressure test would be undertaken on site to determine the existing capacity of
the water network. As the subdivision works are still in progress, actual testing pertaining to
the specific site is not available. However, MRP have made assumptions based on
experience and prior available data in the area. Importantly, the capacity of the water network
for fire flow is outside of Coast2Bay’s control and any future upgrades by Unitywater are not
known / allowed for. Based on MRP’s advice, a booster assembly unit is required and would
need to be located adjacent to the road frontage, while a fire pump room has also been
Page 3 of 11
Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU25 0118 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.