Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                                Acceptable outcomes
      extractive activities.
      PO26
      The design, operation and staging of the extractive industry has No acceptable outcome provided
      regard to the visual character of the locality
      Buffers, Separation and Amenity
      PO27                                                                No acceptable outcome provided
      The extractive industry is located on a site which has sufficient
      area to provide adequate setback of operations from road
      frontages, site boundaries, surrounding residential uses and
      other sensitive receptors, such that the extractive industry
      achieves an acceptable standard of visual amenity and control
      over noise, light, dust and vibration impacts.
      PO28
      The extractive industry is adequately separated from sensitive      No acceptable outcome provided
      uses to minimise potential for nuisance.
      PO29
      The extractive industry provides onsite drainage that is            No acceptable solution provided
      designed, constructed and maintained to:
      (a)    avoid erosion;
      (b)    prevent pollution of groundwater and surface water;
      (c)    protect downstream water quality;
      (d)    mitigate the potential adverse impacts on the storage
             capacity volume of a floodplain;
      (e)    prevent additional flooding or inundation; and
      (f)    provide opportunities to recycle water for reuse in
             processing, washing and/or screening of materials, dust
             suppression and on product stockpiles, overburden
             stockpiles, revegetation or rehabilitation areas and wheel
             wash facilities.

      Hours of operation
      PO30                                                                   No acceptable solution provided
      Extractive industry activities occurs at times that will not result in
      disturbance to surrounding uses.
      Management of Operations
      PO31                                                                No acceptable solution provided
      Noise, vibration and dust emissions from the development i s
      managed to acceptable levels.
      PO32
      Operations minimise lighting impacts on roads and                   No acceptable solution provided
      surrounding properties.
      PO33
      Extractive industry operation areas are fenced to prevent           No acceptable solution provided
      unauthorised or accidental public entry.
      PO34
      Development does not compromise the stability, safety or            No acceptable solution provided
      operation of infrastructure.
      PO35
      Development is designed and managed to minimise the risk            No acceptable solution provided
      and impact of any accidental spills or releases of chemicals
      and other materials that may contaminate soil, stormwater,
      groundwater or air.
      Landscaping


**FINAL DRAFT ­ Post Consultation 2019**                                                                       Page 5 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.