Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
extractive activities.
PO26
The design, operation and staging of the extractive industry has No acceptable outcome provided
regard to the visual character of the locality
Buffers, Separation and Amenity
PO27 No acceptable outcome provided
The extractive industry is located on a site which has sufficient
area to provide adequate setback of operations from road
frontages, site boundaries, surrounding residential uses and
other sensitive receptors, such that the extractive industry
achieves an acceptable standard of visual amenity and control
over noise, light, dust and vibration impacts.
PO28
The extractive industry is adequately separated from sensitive No acceptable outcome provided
uses to minimise potential for nuisance.
PO29
The extractive industry provides onsite drainage that is No acceptable solution provided
designed, constructed and maintained to:
(a) avoid erosion;
(b) prevent pollution of groundwater and surface water;
(c) protect downstream water quality;
(d) mitigate the potential adverse impacts on the storage
capacity volume of a floodplain;
(e) prevent additional flooding or inundation; and
(f) provide opportunities to recycle water for reuse in
processing, washing and/or screening of materials, dust
suppression and on product stockpiles, overburden
stockpiles, revegetation or rehabilitation areas and wheel
wash facilities.
Hours of operation
PO30 No acceptable solution provided
Extractive industry activities occurs at times that will not result in
disturbance to surrounding uses.
Management of Operations
PO31 No acceptable solution provided
Noise, vibration and dust emissions from the development i s
managed to acceptable levels.
PO32
Operations minimise lighting impacts on roads and No acceptable solution provided
surrounding properties.
PO33
Extractive industry operation areas are fenced to prevent No acceptable solution provided
unauthorised or accidental public entry.
PO34
Development does not compromise the stability, safety or No acceptable solution provided
operation of infrastructure.
PO35
Development is designed and managed to minimise the risk No acceptable solution provided
and impact of any accidental spills or releases of chemicals
and other materials that may contaminate soil, stormwater,
groundwater or air.
Landscaping
**FINAL DRAFT Post Consultation 2019** Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.