Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                                  Acceptable outcomes
      PO36                                                                  No acceptable solution provided
      Landscaping complements biodiversity values in the
      surrounding area.
      Rehabilitation
      PO37
      Rehabilitation of the site, over the life of the project and on its   No acceptable solution provided
      completion:
      (a)    provides progressive/ staged rehabilitation works;
      (b)    includes appropriate clean­up works (taking particular
             account of areas of possible soil or water
             contamination);
      (c)    results in a stable final landform;
      (d)    provides suitable drainage and hydraulic conditions; and
      (e)    achieves a suitable degree of revegetation consistent
             with potential post extraction land use.

      PO38
      Rehabilitation allows for suitable use of any water storage           No acceptable solution provided
      created through the extraction process, having regard to water
      quality, hydraulic conditions, land form and vegetation.
      PO39
      Rehabilitation works for each operational stage are bonded to No acceptable solution provided
      ensure the effective return of disturbed areas to acceptable land
      use suitability.




**FINAL DRAFT ­ Post Consultation 2019**                                                                      Page 6 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.